The following list of standards posted for public comment are drawn from the ANSI Standards Action Bulletin, Standards Development Organization (SDO) websites, and/or submitted to Women in Standards by the publishing SDO. Standards posted for public comment provides an opportunity for those not involved in the drafting of the standard to share their thoughts, ideas, concerns, and proposed solutions regarding the draft standard.

The Women in Standards SDO Directory includes information on joining an SDO’s standards development committee(s) and submitting public comment, or visit the Standards Action page or SDO website for additional information and to submit comment. (To submit a standard for inclusion in the below list, email admin@womeninstandards.org)

TIP: For guidance on crafting a strong public comment, click here!

AAFS, AAMI, ABMA, AGMA, AHAM, AHRI, AIAA, AISI, ALI, AMCA, ANS, API, ASA, ASABE, ASCE, ASC X9, ASHRAE, ASME, ASQ, ASSP, ASTM, ATIS, AWEA, AWWA, AWS, B11, BHCOE, camts, CGA, CSA, CTA, ECIA, EOS/ESD, ESTA, FCI, FM, GISC, HI, HL7, IAPMO-ASSE, IAPMO, ICC, IEC, IEEE, ISEA, ISO, ITI, ITSDF, NECA, NEMA, NETA, NSF, OPEI, PMI, RIA, SCTE, SDI, TCNA, TIA, UL

AAFS

  • BSR/ASB Std 134-202x, Standard for Analyzing Pathological Conditions and Anomalies in Forensic Anthropology (new standard) – comment due July 6
  • BSR/AAFS ASB BPR 052-202x, Best Practice Recommendation for the Detection of Footwear and Tire Impression Evidence (new standard) – comment due July 13
  • BSR/ASB BPR 094-202x, Postmortem Fingerprint Recovery: Guidance and Best Practices for Disaster Victim Identification (new standard) – comment due July 13
  • BSR/ASB Std 026-202x, Canine Detection of Humans: An Aged Trail Using Pre-Scented Canines (new standard) – comment due July 27
  • BSR/ASB Std 014-202x, Standard for Friction Ridge Examination Training Program (new standard) – comment due August 17

AAMI

  • BSR/AAMI EC12-2000 (R202x), Disposable ECG electrodes (reaffirmation of ANSI/AAMI EC12-2000) – comment due July 13
  • BSR/AAMI EC53-2013 (R202x), ECG trunk cables and patient leadwires (reaffirmation of ANSI/AAMI EC53-2013) – comment due July 13
  • BSR/AAMI EC57-2012 (R202x), Testing and reporting performance results of cardiac rhythm and ST segment measurement algorithms (reaffirmation of ANSI/AAMI EC57-2012) – comment due July 13
  • BSR/AAMI 2700-2-1-202x, Medical Devices and Medical Systems – Essential Safety and Performance Requirements for Equipment Comprising the Patient-Centric Integrated Clinical Environment (ICE) – Part 2-1: Particular Requirements or Forensic Data Logging (new standard) – comment due August 10
  • BSR/AAMI/ISO 14937-2009 (R202x), Sterilization of health care products – General requirements for characterization of a sterilizing agent and the development, validation and routine control of a sterilization process for medical devices (reaffirmation of ANSI/AAMI/ISO 14937-2009 (R2013)) – comment due August 10

ABMA

  • BSR/ABMA 11-2014 (R202x), Load Ratings and Fatigue Life for Ball Bearings (reaffirmation of ANSI/ABMA 11-2014) – comment due July 13
  • BSR/ABMA 19.2-2013 (R202x), Tapered Roller Bearings, Radial Inch Design (reaffirmation of ANSI/ABMA 19.2-2013) – comment due July 13
  • BSR ABMA 9-2015 (R202x), Load Ratings and Fatigue Life for Ball Bearings (reaffirmation of ANSI ABMA 9-2015) – comment due August 10
  • BSR/ABMA 10A-2001 (R202x), Metal Balls for Unground Bearings and Other Uses (reaffirmation of ANSI/ABMA 10A-2001 (R2015)) – comment due August 10

AGMA

  • BSR/AGMA 1104-2009 (R202x), Tolerance Specification for Shaper Cutters (reaffirmation of ANSI/AGMA 1104-2009 (R2015)) – comment due July 20
  • BSR/AGMA 2015-2-B2015 (R202x), Gear Tooth Flank Tolerance Classification System – Definitions and Allowable Values of Double Flank Radial Composite Deviations (reaffirmation of ANSI/AGMA 2015-2-B2015) – comment due July 20
  • BSR/AGMA 6014-B-2015 (R202x), Gear Power Rating for Cylindrical Shell and Trunnion Supported Equipment (reaffirmation of ANSI/AGMA 6014-B-2015) – comment due July 27
  • BSR/AGMA 6114-B-2015 (R202x), Gear Power Rating for Cylindrical Shell and Trunnion Supported Equipment – Metric Edition (reaffirmation of ANSI/AGMA 6114-B-2015) – comment due July 27
  • BSR/AGMA 9112-B-2015 (R202x), Bores and Keyways for Flexible Couplings (Metric Series) (reaffirmation of ANSI/AGMA 9112-B-2015) – comment due July 27
  • BSR/AGMA 2111-A98 (R202x), Cylindrical Wormgearing Tolerance and Inspection – Methods (Metric) (reaffirmation of ANSI/AGMA 2111-A98) – comment due August 17

AHAM

  • BSR/AHAM AC-1-202x, Method of Measuring Performance of Portable Household Electric Room Air Cleaners (revision of ANSI/AHAM AC-1-2015) – comment due July 6

AIAA

AHRI

  • BSR/AHRI Standard 210/240-202x, Performance Rating of Unitary Air-Conditioning and Air-Source Heat Pump Equipment (revision of ANSI/AHRI Standard 210/240-2008 with Addenda 1 and 2-2011) – comment due August 10

AISI

  • BSR/AISI S923-202x, Test Standard for Determining the Strength and Stiffness of Shear Connections in Composite Members (new standard) – comment due August 10

AMCA

ANS

  • BSR/ANS 59.51-1997 (R202x), Fuel Oil Systems for Safety-Related Emergency Diesel Generators (reaffirmation of ANSI/ANS 59.51-1997 (R2015)) – comment due July 6
  • BSR/ANS 59.52-1998 (R202x), Lubricating Oil Systems for Safety-Related Emergency Diesel Generators (reaffirmation of ANSI/ANS 59.52-1998 (R2015)) – comment due July 6
  • BSR/ANS 56.8-202x, Containment System Leakage Test Requirements (revision of ANSI/ANS 56.8-2002 (R2016)) – comment due July 7
  • BSR/ANS 6.3.1-1987 (R202x), Program for Testing Radiation Shields in Light Water Reactors (LWR) (reaffirmation of ANSI/ANS 6.3.1-1987 (R2015)) – comment due July 13
  • BSR/ANS 8.27-2015 (R202x), Burnup Credit for LWR Fuel (reaffirmation of ANSI/ANS 8.27-2015) – comment due July 20
  • BSR/ANS 57.8-202x, Fuel Assembly Identification (revision of ANSI/ANS 57.8-1995 (R2017)) – comment due July 21

API

  • BSR/API RP 13M-4/ISO 13503-4-2006 (R202x), API Recommended Practice for Measuring Stimulation and Gravel-Pack Fluid Leakoff under Static Conditions, 1st Edition (reaffirmation of ANSI/API RP 13M/ISO 13503-4-2006) – comment due July 13
  • BSR/API RP 13I/ISO 10416-2008 (R202x), Recommended Practice for Laboratory Testing of Drilling Fluids (reaffirmation of ANSI/API RP 13I/ISO 10416-2008) – comment due July 13
  • BSR/API RP 19D/ISO 13503-5-2007 (R202x), Measuring the Long-Term Conductivity of Proppants, 1st Edition (reaffirmation of ANSI/API RP 19D/ISO 13503-5-2007) – comment due July 13
  • BSR/API RP 100-1-2019 (R202x), Hydraulic Fracturing – Well Integrity and Fracture Containment (reaffirmation of ANSI/API RP 100-1-2019) – comment due August 17
  • BSR/API RP 100-2-2015 (R202x), Managing Environmental Aspects Associated with Exploration and Production Operations including Hydraulic Fracturing (reaffirmation of ANSI/API RP 100-2-2015) – comment due August 17

ASA

  • BSR/ASA S1.13-202x, Measurement of Sound Pressure Levels in the Air (new standard) – comment due July 6
  • BSR/ASA S12.61-202x, Declaration and Verification of Noise Emission Values of Machinery, Equipment, and Products (new standard)) – comment due July 13
  • BSR/ASA S3.2-202x, Method for Measuring the Intelligibility of Speech over Communication Systems (revision of ANSI/ASA S3.2 -2009 (R2020)) – comment due August 10

ASABE

  • BSR/ASABE EP585.1 MON-202x, Animal Mortality Composting (revision and redesignation of ANSI/ASABE EP585-2015 (R2019)) – comment due July 20
  • BSR/ASAE S604.3 MONYEAR-202x, Safety for Power Take-Off (PTO), PTO Drive Shafts, and Power Input Connection (PIC) for Agricultural Field Equipment (revision of ANSI/ASABE S604.2-OCT2018) – comment due August 10
  • BSR/ASABE D606 MONYear-202x, Properties and Relationships for Distillers Dried Grains with Solubles (DDGS) (new standard) – comment due August 17
  • BSR/ASABE AD4254-11-JAN2012 (R202x), Agricultural machinery – Safety – Part 11: Pick-up balers (reaffirm a national adoption ANSI/ASABE AD4254-11-JAN2012 (R2017)) – comment due August 17

ASCE

  • BSR/ASCE/T&DI 21-202x, Automated People Mover Standard (revision of ANSI/ASCE T&DI 21-2013) – comment due July 20

ASC X9

  • BSR X9.112-2-202x, Wireless Management and Published Security – Part 2: POS and ATM (revision of ANSI X9.112-2-2014) – comment due August 3

ASHRAE

  • BSR/ASHRAE Addendum a to BSR/ASHRAE Standard 147-202x, Reducing the Release of Halogenated Refrigerants from Refrigerating and Air-Conditioning Equipment and Systems (addenda to ANSI/ASHRAE Standard 147-2013) – comment due July 5
  • BSR/ASHRAE Addendum b to BSR/ASHRAE Standard 147-202x, Reducing the Release of Halogenated Refrigerants from Refrigerating and Air-Conditioning Equipment and Systems (addenda to ANSI/ASHRAE Standard 147-2013) – comment due July 5
  • BSR/ASHRAE/ICC/USGBC/IES Addendum be to BSR/ASHRAE/ICC/USGBC/IES Standard 189.1-202x, Standard for the Design of HighPerformance Green Buildings Except Low-Rise Residential Buildings (addenda to ANSI/ASHRAE/ICC/USGBC/IES Standard 189.1-2017) – comment due July 5
  • BSR/ASHRAE/ICC/USGBC/IES Addendum bf to BSR/ASHRAE/ICC/USGBC/IES Standard 189.1-202x, Standard for the Design of HighPerformance Green Buildings Except Low-Rise Residential Buildings (addenda to ANSI/ASHRAE/ICC/USGBC/IES Standard 189.1-2017) – comment due July 5
  • BSR/ASHRAE/ICC/USGBC/IES Addendum bg to BSR/ASHRAE/ICC/USGBC/IES Standard 189.1-202x, Standard for the Design of HighPerformance Green Buildings Except Low-Rise Residential Buildings (addenda to ANSI/ASHRAE/ICC/USGBC/IES Standard 189.1-2017) – comment due July 5
  • BSR/ASHRAE/ICC/USGBC/IES Addendum bn to BSR/ASHRAE/ICC/USGBC/IES Standard 189.1-202x, Standard for the Design of HighPerformance Green Buildings Except Low-Rise Residential Buildings (addenda to ANSI/ASHRAE/ICC/USGBC/IES Standard 189.1-2017) – comment due July 5
  • BSR/ASHRAE/ICC/USGBC/IES Addendum bt to BSR/ASHRAE/ICC/USGBC/IES Standard 189.1-202x, Standard for the Design of HighPerformance Green Buildings Except Low-Rise Residential Buildings (addenda to ANSI/ASHRAE/USGBC/IES Standard 189.1-2017) – comment due July 5
  • BSR/ASHRAE/ICC/USGBC/IES Addendum bu to BSR/ASHRAE/ICC/USGBC/IES Standard 189.1-202x, Standard for the Design of HighPerformance Green Buildings Except Low-Rise Residential Buildings (addenda to ANSI/ASHRAE/USGBC/IES Standard 189.1-2017) – comment due July 5
  • BSR/ASHRAE Standard 41.11-202xR, Standard Methods for Power Measurement (revision of ANSI/ASHRAE Standard 41.11-2014) – comment due July 13
  • BSR/ASHRAE Addendum c to BSR/ASHRAE Standard 15-202x, Safety Standard for Refrigeration Systems (addenda to ANSI/ASHRAE Standard 15-2019) – comment due July 19
  • BSR/ASHRAE/IES Addendum b to BSR/ASHRAE/IES Standard 90.1-202x, Energy Standard for Buildings Except Low-Rise Residential Buildings (addenda to ANSI/ASHRAE/IES Standard 90.1-2019) – comment due July 19
  • BSR/ASHRAE/IES Addendum d to BSR/ASHRAE/IES Standard 90.1-202x, Energy Standard for Buildings Except Low-Rise Residential Buildings (addenda to ANSI/ASHRAE/IES Standard 90.1-2019) – comment due July 19
  • BSR/ASHRAE/IES Addendum i to BSR/ASHRAE/IES Standard 90.1-202x, Energy Standard for Buildings Except Low-Rise Residential Buildings (addenda to ANSI/ASHRAE/IES Standard 90.1-2019) – comment due July 19
  • BSR/ASHRAE/IES Addendum k to BSR/ASHRAE/IES Standard 90.1-202x, Energy Standard for Buildings Except Low-Rise Residential Buildings (addenda to ANSI/ASHRAE/IESNA Standard 90.1-2019) – comment due July 19
  • BSR/ASHRAE/ICC/USGBC/IES Addendum bs to BSR/ASHRAE/ICC/USGBC/IES Standard 189.1-202x, Standard for the Design of HighPerformance Green Buildings Except Low-Rise Residential Buildings (addenda to ANSI/ASHRAE/USGBC/IES Standard 189.1-2017) – comment due July 20
  • BSR/ASHRAE/ICC/USGBC/IES Addendum bs to BSR/ASHRAE/ICC/USGBC/IES Standard 189.1-202x, Standard for the Design of HighPerformance Green Buildings Except Low-Rise Residential Buildings (addenda to ANSI/ASHRAE/USGBC/IES Standard 189.1-2017) – comment due July 20
  • BSR/ASHRAE/ICC/USGBC/IES Addendum aq to BSR/ASHRAE/ICC/USGBC/IES Standard 189.1-202x, Standard for the Design of HighPerformance Green Buildings Except Low-Rise Residential Buildings (addenda to ANSI/ASHRAE/ICC/USGBC/IES Standard 189.1-2017) – comment due July 26
  • BSR/ASHRAE/ICC/USGBC/IES Addendum ax to BSR/ASHRAE/ICC/USGBC/IES Standard 189.1-202x, Standard for the Design of HighPerformance Green Buildings Except Low-Rise Residential Buildings (addenda to ANSI/ASHRAE/ICC/USGBC/IES Standard 189.1-2017) – comment due July 26
  • BSR/ASHRAE/ICC/USGBC/IES Addendum bc to BSR/ASHRAE/ICC/USGBC/IES Standard 189.1-202x, Standard for the Design of HighPerformance Green Buildings Except Low-Rise Residential Buildings (addenda to ANSI/ASHRAE/ICC/USGBC/IES Standard 189.1-2017) – comment due July 26
  • BSR/ASHRAE/ICC/USGBC/IES Addendum bi to BSR/ASHRAE/ICC/USGBC/IES Standard 189.1-202x, Standard for the Design of HighPerformance Green Buildings Except Low-Rise Residential Buildings (addenda to ANSI/ASHRAE/ICC/USGBC/IES Standard 189.1-2017) – comment due July 26
  • BSR/ASHRAE/ICC/USGBC/IES Addendum bj to BSR/ASHRAE/ICC/USGBC/IES Standard 189.1-202x, Standard for the Design of HighPerformance Green Buildings Except Low-Rise Residential Buildings (addenda to ANSI/ASHRAE/ICC/USGBC/IES Standard 189.1-2017) – comment due July 26
  • BSR/ASHRAE/ICC/USGBC/IES Addendum bo to BSR/ASHRAE/ICC/USGBC/IES Standard 189.1-202x, Standard for the Design of HighPerformance Green Buildings Except Low-Rise Residential Buildings (addenda to ANSI/ASHRAE/ICC/USGBC/IES Standard 189.1-2017) – comment due July 26
  • BSR/ASHRAE/ICC/USGBC/IES Addendum bq to BSR/ASHRAE/ICC/USGBC/IES Standard 189.1-202x, Standard for the Design of HighPerformance Green Buildings Except Low-Rise Residential Buildings (addenda to ANSI/ASHRAE/ICC/USGBC/IES Standard 189.1-2017) – comment due July 26
  • BSR/ASHRAE/ICC/USGBC/IES Addendum br to BSR/ASHRAE/ICC/USGBC/IES Standard 189.1-202x, Standard for the Design of HighPerformance Green Buildings Except Low-Rise Residential Buildings (addenda to ANSI/ASHRAE/ICC/USGBC/IES Standard 189.1-2017) – comment due July 26
  • BSR/ASHRAE/ICC/USGBC/IES Addendum bv to BSR/ASHRAE/ICC/USGBC/IES Standard 189.1-202x, Standard for the Design of HighPerformance Green Buildings Except Low-Rise Residential Buildings (addenda to ANSI/ASHRAE/USGBC/IES Standard 189.1-2017) – comment due July 26
  • BSR/ASRHAE/ICC/USGBC/IES Addendum w to BSR/ASRHAE/ICC/USGBC/IES Standard 189.1-202x, Standard for the Design of HighPerformance Green Buildings Except Low-Rise Residential Buildings (addenda to ANSI/ASHRAE/USGBC/IES Standard 189.1-2017) – comment due July 26
  • BSR/ASHRAE Standard 205-202x, Standard Representation of Performance Simulation Data for HVAC&R and Other Facility Equipment (new standard) – comment due July 28

ASME

  • BSR/ASME EA-4-2010 (R202x), Energy Assessment for Compressed Air Systems (reaffirmation of ANSI/ASME EA-4-2010 (R2015)) – comment due July 7
  • BSR/ASME B16.1-202x, Gray Iron Pipe Flanges and Flanged Fittings – Classes 25, 125, and 250 (revision of ANSI/ASME B16.1-2015) – comment due July 19
  • BSR/ASME B16.36-202x, Orifice Flanges (revision of ANSI/ASME B16.36-2015) – comment due July 26
  • BSR/ASME B16.48-202x, Line Blanks (revision of ANSI/ASME B16.48-2015) – comment due July 26
  • BSR/ASME B31G-202x, Manual for Determining the Remaining Strength of Corroded Pipelines (revision of ANSI/ASME B31G-2012 (R2017)) – comment due July 26
  • BSR/ASME B31.8-202x, Gas Transmission and Distribution Piping Systems (revision of ANSI/ASME B31.8-2018) – comment due August 3
  • BSR/ASME B31.8S-202x, Managing System Integrity of Gas Pipelines (revision of ANSI/ASME B31.8S-2018) – comment due August 3
  • BSR/ASME NOG-1-202x, Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder) (revision of
  • ANSI/ASME NOG-1-2015) – comment due August 3
  • BSR/ASME A13.1-202x, Scheme for the Identification of Piping Systems (revision of ANSI/ASME A13.1-2015) – comment due August 11
  • BSR/ASME B16.34-202x, Valves – Flanged, Threaded, and Welding End (revision of ANSI/ASME B16.34-2017) – comment due August 17
  • BSR/ASME Y14.43-2011 (R202x), Dimensioning and Tolerancing Principles for Gages and Fixtures (reaffirmation of ANSI/ASME Y14.43-2011) – comment due August 18
  • BSR/ASME B31.9-202x, Building Services Piping (revision of ANSI/ASME B31.9-2017) – comment due August 18
  • BSR/ASME B89.4.23-202x, X -Ray Computed Tomography (Ct) Performance Evaluation Standard (new standard) – comment due August 25
  • BSR/ASME PTC 12.1-2015 (R202x), Closed Feedwater Heaters (reaffirmation of ANSI/ASME PTC 12.1-2015) – comment due August 25
  • BSR/ASME B16.47-202x, Large Diameter Steel Flanges NPS 26 through NPS 60 Metric/Inch Standard (revision of ANSI/ASME B16.47-2017) – comment due August 25
  • BSR/ASME B16.5-202x, Pipe Flanges and Flanged Fittings NPS Through NPS 24 Metric/Inch Standard (revision of ANSI/ASME B16.5-2017) – comment due September 1
  • BSR/UL 61496-1-202x, Standard for Safety for Electro-Sensitive Protective Equipment, Part 1: General Requirements and Tests, UL 61496-1 (national adoption of IEC 61496-1 with modifications and revision of ANSI/UL 61496-1-2001 (R2011)) – comment due September 1
  • BSR/UL 61496-2-202x, Standard for Safety of Machinery – Electro-Sensitive Protective Equipment – Part 2: Particular Requirements for Equipment Using Active Opto-Electronic Protective Devices (AOPDs), UL 61496-2 (national adoption of IEC 61496-2 with modifications and revision of ANSI/UL 61496-2-2001 (R2011)) – comment due September 1
  • BSR/UL 1254-202X, Standard for Pre-Engineered Dry and Wet Chemical Extinguishing System Units (revision of ANSI/UL 1254-2018) – comment due September 1

ASQ

  • BSR/ASQ E5-202x, Quality Program Guidelines for Nonnuclear Power Generation Facilities (new standard) – comment due July 13

ASSP

  • BSR/ASSP Z359.14-202x, Safety Requirements for Self-Retracting Devices for Personal Fall Arrest and Rescue Systems (revision and redesignation of ANSI/ASSE Z359.14-2014) – comment due July 13
  • BSR/ASSP A10.33-202x, Safety & Health Program Requirements for Multi-Employer Projects (revision and redesignation of ANSI/ASSE A10.33-2011 (R2016)) – comment due August 3
  • BSR/ASSP Z459.1-202x, Safety Requirements for Rope Access Systems (new standard) – comment due August 17
  • BSR/ASSP Z359.1-202x, The Fall Protection Code (revision and redesignation of ANSI/ASSE Z359.1-2016) – comment due August 17

ASTM

  • BSR/ASTM WK63718-202x, Test Method for Determination of Fatty Acid Methyl Esters (FAME) in Aviation Turbine Fuel using MidInfrared Laser Spectroscopy (new standard) – comment due July 6
  • BSR/ASTM C559-2016 (R202x), Test Method for Bulk Density by Physical Measurements of Manufactured Carbon and Graphite Articles (reaffirmation of ANSI/ASTM C559-2016) – comment due July 6
  • BSR/ASTM C695-2015 (R202x), Test Method for Compressive Strength of Carbon and Graphite (reaffirmation of ANSI/ASTM C695-2015) – comment due July 6
  • BSR/ASTM C749-2015 (R202x), Test Method for Tensile Stress-Strain of Carbon and Graphite (reaffirmation of ANSI/ASTM C749-2015) – comment due July 6
  • BSR/ASTM C783-2010 (R202x), Practice for Core Sampling of Graphite Electrodes (reaffirmation of ANSI/ASTM C783-2010 (R2015)) – comment due July 6
  • BSR/ASTM C1025-2015 (R202x), Test Method for Modulus of Rupture in Bending of Electrode Graphite (reaffirmation of ANSI/ASTM C1025-2015) – comment due July 6
  • BSR/ASTM D6986-2010 (R202x), Test Method for Free Water, Particulate and Other Contamination in Aviation Fuels (Visual Inspection Procedures) (reaffirmation of ANSI/ASTM D6986-2010 (R2016)) – comment due July 6
  • BSR/ASTM D7972-2014 (R202x), Test Method for Flexural Strength of Manufactured Carbon and Graphite Articles Using ThreePoint Loading at Room Temperature (reaffirmation of ANSI/ASTM D7972-2014) – comment due July 6
  • BSR/ASTM F1749-2015 (R202x), Specification for Fitness Equipment and Fitness Facility Safety Signage and Labels (reaffirmation of ANSI/ASTM F1749-2015) – comment due July 6
  • BSR/ASTM F2276-2010 (R202x), Specification for Fitness Equipment (reaffirmation of ANSI/ASTM F2276-2010 (R2015)) – comment due July 6
  • BSR/ASTM F2571-2015 (R202x), Test Methods for Evaluating Design and Performance Characteristics of Fitness Equipment (reaffirmation of ANSI/ASTM F2571-2015) – comment due July 6
  • BSR/ASTM F2810-2015 (R202x), Specification for Elliptical Trainers (reaffirmation of ANSI/ASTM F2810-2015) – comment due July 6
  • BSR/ASTM F2811-2015 (R202x), Test Methods for Evaluating Design and Performance Characteristics of Elliptical Trainers (reaffirmation of ANSI/ASTM F2811-2015) – comment due July 6
  • BSR/ASTM C560-202x, Test Methods for Chemical Analysis of Graphite (revision of ANSI/ASTM C560-2015) – comment due July 6
  • BSR/ASTM C651-202x, Test Method for Flexural Strength of Manufactured Carbon and Graphite Articles Using Four-Point Loading at Room Temperature (revision of ANSI/ASTM C651-2015) – comment due July 6
  • BSR/ASTM C748-202x, Test Method for Rockwell Hardness of Graphite Materials (revision of ANSI/ASTM C748-2010 (R2015)) – comment due July 6
  • BSR/ASTM D910-202x, Specification for Leaded Aviation Gasolines (revision of ANSI/ASTM D910-2019) – comment due July 6
  • BSR/ASTM D1655-202x, Specification for Aviation Turbine Fuels (revision of ANSI/ASTM D1655-2020) – comment due July 6
  • BSR/ASTM D3244-202x, Practice for Utilization of Test Data to Determine Conformance with Specifications (revision of ANSI/ASTM D3244-2018) – comment due July 6
  • BSR/ASTM D3948-202x, Test Method for Determining Water Separation Characteristics of Aviation Turbine Fuels by Portable Separometer (revision of ANSI/ASTM D3948-2014 (R2018)) – comment due July 6
  • BSR/ASTM D4054-202x, Practice for Evaluation of New Aviation Turbine Fuels and Fuel Additives (revision of ANSI/ASTM D4054-2019) – comment due July 6
  • BSR/ASTM D4306-202x, Practice for Aviation Fuel Sample Containers for Tests Affected by Trace Contamination (revision of ANSI/ASTM D4306-2015) – comment due July 6
  • BSR/ASTM D4865-202x, Guide for Generation and Dissipation of Static Electricity in Petroleum Fuel Systems (revision of ANSI/ASTM D4865-2019) – comment due July 6
  • BSR/ASTM D6299-202x, Practice for Applying Statistical Quality Assurance and Control Charting Techniques to Evaluate Analytical Measurement System Performance (revision of ANSI/ASTM D6299-2019) – comment due July 6
  • BSR/ASTM D6300-202x, Practice for Determination of Precision and Bias Data for Use in Test Methods for Petroleum Products and Lubricants (revision of ANSI/ASTM D6300-2020) – comment due July 6
  • BSR/ASTM D7224-202x, Test Method for Determining Water Separation Characteristics of Kerosine-Type Aviation Turbine Fuels Containing Additives by Portable Separometer (revision of ANSI/ASTM D7224-2014 (R2018)) – comment due July 6
  • BSR/ASTM D7566-202x, Specification for Aviation Turbine Fuel Containing Synthesized Hydrocarbons (revision of ANSI/ASTM D7566-2020) – comment due July 6
  • BSR/ASTM D8289-202x, Test Method for Tensile Strength Estimate by Disc Compression of Manufactured Graphite (revision of ANSI/ASTM D8289-2019) – comment due July 6
  • BSR/ASTM E119-202x, Test Methods for Fire Tests of Building Construction and Materials (revision of ANSI/ASTM E119-2019) – comment due July 6
  • BSR/ASTM F1250-202x, Specification for Stationary Upright and Recumbent Exercise Bicycles and Upper and Total Body Ergometers (revision of ANSI/ASTM F1250-2018) – comment due July 6
  • BSR/ASTM F1696-202x, Test Method for Energy Performance of Stationary-Rack, Door-Type Commercial Dishwashing Machines (revision of ANSI/ASTM F1696-2018) – comment due July 6
  • BSR/ASTM F1920-202x, Test Method for Performance of Rack Conveyor Commercial Dishwashing Machines (revision of ANSI/ASTM F1920-2015) – comment due July 6
  • BSR/ASTM F2337-202x, Test Method for Treestand Fall Arrest System (revision of ANSI/ASTM F2337-2016) – comment due July 6
  • BSR/ASTM F3101-202x, Specification for Unsupervised Public Use Outdoor Fitness Equipment (revision of ANSI/ASTM F3101-2015) – comment due July 6
  • BSR/ASTM F3104-202x, Test Methods for Evaluating Design and Performance Characteristics of Externally Loaded Strength Training Equipment, Strength Training Benches and External Weight Storage Equipment (revision of ANSI/ASTM F3104-2014) – comment due July 6
  • BSR/ASTM F3105-202x, Specification for Externally Loaded Strength Training Equipment, Strength Training Benches and External Weight Storage Equipment (revision of ANSI/ASTM F3105-2014) – comment due July 6
  • ANSI/ASTM E2750-2017, Guide for Extension of Data from Penetration Firestop System Tests Conducted in Accordance with ASTM (withdrawal of ANSI/ASTM E2750-2017) – comment due July 6
  • BSR/ASTM WK57370-202x, Test Method for Seam Measurement Procedure for Baseballs and Softballs (new standard) – comment due July 27
  • BSR/ASTM WK59635-202x, Test Method for Determining Flammability of Exterior Wall Assemblies for Mass Timber Multi-story Structures (new standard) – comment due July 27
  • BSR/ASTM WK63718-202x, Test Method for Determination of Fatty Acid Methyl Esters (FAME) in Aviation Turbine Fuel using MidInfrared Laser Spectroscopy (new standard) – comment due July 27
  • BSR/ASTM WK68390-202x, Test Method for Determining the Water Holding Capacity of Equine Surfaces (new standard) – comment due July 27
  • BSR/ASTM WK71122-202x, Test Method for Permeability of Equine Surfaces (new standard) – comment due July 27
  • BSR/ASTM D3240-2015 (R202x), Test Method for Undissolved Water In Aviation Turbine Fuels (reaffirmation of ANSI/ASTM D3240 -2015) – comment due July 27
  • BSR/ASTM E1323-2015 (R202x), Guide for Evaluating Laboratory Measurement Practices and the Statistical Analysis of the Resulting Data (reaffirmation of ANSI/ASTM E1323-2015) – comment due July 27
  • BSR/ASTM E2819-2011 (R202x), Practice for Single- and Multi-Level Continuous Sampling of a Stream of Product by Attributes Indexed by AQL (reaffirmation of ANSI/ASTM E2819-2011 (R2015)) – comment due July 27
  • BSR/ASTM F1784-2008 (R202x), Test Method for Performance of a Pasta Cooker (reaffirmation of ANSI/ASTM F1784-2008 (R2015)) – comment due July 27
  • BSR/ASTM F1785-2008 (R202x), Test Method for Performance of Steam Kettles (reaffirmation of ANSI/ASTM F1785-2008 (R2015)) – comment due July 27
  • BSR/ASTM F1787-2008 (R202x), Test Method for Performance of Rotisserie Ovens (reaffirmation of ANSI/ASTM F1787-2008 (R2015)) – comment due July 27
  • BSR/ASTM F2202-2007 (R202x), Specification for Slow Cook/Hold Ovens and Hot Food Holding Cabinets (reaffirmation of ANSI/ASTM F2202-2007 (R2015)) – comment due July 27
  • BSR/ASTM F2237-2008 (R202x), Test Method for Performance of Upright Overfired Broilers (reaffirmation of ANSI/ASTM F2237 -2008 (R2015)) – comment due July 27
  • BSR/ASTM F2398-2011 (R202x), Test Method for Measuring Moment of Inertia and Center of Percussion of a Baseball or Softball Bat (reaffirmation of ANSI/ASTM F2398-2011 (R2015)) – comment due July 27
  • BSR/ASTM F2875-2010 (R202x), Guide for Laboratory Requirements Necessary to Test Commercial Cooking and Warming Appliances to ASTM Test Methods (reaffirmation of ANSI/ASTM F2875-2010 (R2015)) – comment due July 27
  • BSR/ASTM D910-202x, Specification for Leaded Aviation Gasolines (revision of ANSI/ASTM D910-2019) – comment due July 27
  • BSR/ASTM D1655-202x, Specification for Aviation Turbine Fuels (revision of ANSI/ASTM D1655-2020) – comment due July 27
  • BSR/ASTM D3241-202x, Test Method for Thermal Oxidation Stability of Aviation Turbine Fuels (revision of ANSI/ASTM D3241-2020) – comment due July 27
  • BSR/ASTM D4054-202x, Practice for Evaluation of New Aviation Turbine Fuels and Fuel Additives (revision of ANSI/ASTM D4054-2019) – comment due July 27
  • BSR/ASTM D7254-202x, Specification for Polypropylene (PP) Siding (revision of ANSI/ASTM D7254-2017) – comment due July 27
  • BSR/ASTM D7719-202x, Specification for High Aromatic Content Unleaded Hydrocarbon Aviation Gasoline (revision of ANSI/ASTM D7719-2018) – comment due July 27
  • BSR/ASTM D7793-202x, Specification for Insulated Vinyl Siding (revision of ANSI/ASTM D7793-2017) – comment due July 27
  • BSR/ASTM E23-202x, Test Methods for Notched Bar Impact Testing of Metallic Materials (revision of ANSI/ASTM E23-2018) – comment due July 27
  • BSR/ASTM E136-202x, Test Method for Assessing Combustibility of Materials Using a Vertical Tube Furnace at 750C (revision of ANSI/ASTM E136-2019) – comment due July 27
  • BSR/ASTM E800-202x, Guide for Measurement of Gases Present or Generated during Fires (revision of ANSI/ASTM E800-2014) – comment due July 27
  • BSR/ASTM E1678-202x, Test Method for Measuring Smoke Toxicity for Use in Fire Hazard Analysis (revision of ANSI/ASTM E1678-2015) – comment due July 27
  • BSR/ASTM E2061-202x, Guide for Fire Hazard Assessment of Rail Transportation Vehicles (revision of ANSI/ASTM E2061-2018) – comment due July 27
  • BSR/ASTM E2280-202x, Guide for Fire Hazard Assessment of the Effect of Upholstered Seating Furniture Within Patient Rooms of Health Care Facilities (revision of ANSI/ASTM E2280-2017) – comment due July 27
  • BSR/ASTM E2935-202x, Practice for Conducting Equivalence Testing in Laboratory Applications (revision of ANSI/ASTM E2935-2017) – comment due July 27
  • BSR/ASTM E2989-202x, Guide for Assessment of Continued Applicability of Reaction to Fire Test Reports Used in Building Regulation (revision of ANSI/ASTM E2989-2019) – comment due July 27
  • BSR/ASTM F1446-202x, Test Methods for Equipment and Procedures Used in Evaluating the Performance Characteristics of Protective Headgear (revision of ANSI/ASTM F1446-2015a) – comment due July 27
  • BSR/ASTM F1960-202x, Specification for Cold Expansion Fittings with PEX Reinforcing Rings for Use with Cross-Linked Polyethylene (PEX) and Polyethylene of Raised Temperature (PE-RT) Tubing (revision of ANSI/ASTM F1960-2019) – comment due July 27
  • BSR/ASTM F2806-202x, Specification for Acrylonitrile-Butadiene-Styrene (ABS) Plastic Pipe (Metric SDR-PR) (revision of ANSI/ASTM F2806-2017) – comment due July 27
  • BSR/ASTM F2844-202x, Test Method for Displacement Compression of Softball and Baseball Bat Barrels (revision of ANSI/ASTM F2844-2015 (R2016)) – comment due July 27
  • BSR/ASTM F2845-202x, Test Method for Measuring the Dynamic Stiffness (DS) and Cylindrical Coefficient of Restitution (CCOR) of Baseballs and Softballs (revision of ANSI/ASTM F2845-2014) – comment due July 27
  • BSR/ASTM F3347-202x, Specification for Metal Press Insert Fittings with Factory Assembled Stainless Steel Press Sleeve for SDR9 Cross-Linked Polyethylene (PEX) Tubing (revision of ANSI/ASTM F3347-2020) – comment due July 27
  • BSR/ASTM F3348-202x, Specification for Plastic Press Insert Fittings with Factory Assembled Stainless Steel Press Sleeve for SDR9 Cross-Linked Polyethylene (PEX) Tubing (revision of ANSI/ASTM F3348-2020) – comment due July 27
  • BSR/ASTM F3353-202x, Guide for Shipboard Use of Lithium-Ion (Li-ion) Batteries (revision of ANSI/ASTM F3353-2019) – comment due July 27
  • BSR/ASTM F3386-202x, Specification for Detonation Flame Arresters (revision and redesignation of ANSI/ASTM F3386/F3386M-2019) – comment due July 27
  • BSR/ASTM F1533-202x, Specification for Deformed Polyethylene (PE) Liner (new standard) – comment due August 3
  • BSR/ASTM F2720-202x, Specification for Glass Fiber Reinforced Polyethylene (PE-GF) Spiral Wound Large Diameter Pipe (new standard) – comment due August 3

ATIS

  • BSR/ATIS 0600320-202x, Above-Baseline Electrical Protection for Designated Information and Communications Technology (ICT) Facilities against High-Altitude Electromagnetic Pulse (HEMP) (revision of ANSI/ATIS 0600320-2015) – comment due August 10
  • BSR/ATIS 0600321-202x, Electrical Protection for Network Operator-Type Equipment Positions (revision of ANSI/ATIS 0600321 -2015) – comment due August 10

AWEA

  • BSR/AWEA 61400-26-1-202x, Availability for wind energy generation systems (identical national adoption of IEC 61400-26-1:2019) – comment due August 10
  • BSR/AWEA 5000-1-202x, AWEA Wind Workforce Definitions 2020 (new standard) – comment due August 10

AWWA

  • BSR/AWWA G430-2014 (R202x), Security Practices for Operations and Management (reaffirmation of ANSI/AWWA G430-2014) – comment due July 27
  • BSR/AWWA C670-202x, Online Chlorine Analyzer Operation and Maintenance (revision of ANSI/AWWA C670-2015) – comment due July 27
  • BSR/AWWA C515-202x, Reduced-Wall, Resilient-Seated Gate Valves for Water Supply Service (revision of ANSI/AWWA C515-2015) – comment due August 17

AWS

  • BSR/AWS C3.9M/C3.9-202x, Specification for Resistance Brazing (new standard) – comment due July 6
  • BSR/AWS C3.8M/C3.8-202x, Specification for the Ultrasonic Pulse-Echo Examination of Brazed Joints (revision of ANSI/AWS C3.8M/C3.8-2011) – comment due July 6
  • BSR/AWS D1.4/D1.4M-202x-AMD1, Structural Welding Code – Steel Reinforcing Bars (revision and redesignation of ANSI/AWS D1.4/D1.4M-2018) – comment due July 13
  • BSR/AWS D16.5M/D16.5-202x, Training Guide for Robotic Arc Welding Personnel (new standard) – comment due July 27
  • BSR/AWS J1.3/J1.3M-202x-AMD1, Specification for Materials Used in Resistance Welding Electrodes and Tooling (addenda to ANSI/AWS J1.3M/J1.3-2020) – comment due August 17

B11

  • BSR B11.27-202x, Safety Requirements for Electro-Discharge Machines (new standard) – comment due July 6
  • BSR B11.7-202x, Cold Headers and Cold Formers – Safety Requirements for Construction, Care, and Use (revision of ANSI B11.7 -1995 (R2020)) – comment August 10

BHCOE

  • BSR/BHCOE 101-202x, Standard for the Documentation of Clinical Records for Applied Behavior Analysis Services (new standard) – comment due August 17
  • BSR/BHCOE 201-202x, Standards and Guidelines for Effective Applied Behavior Analysis Organizations (new standard) – comment due August 17

camts

CGA

  • BSR/CGA H-5-202x, Installation Standards for Bulk Hydrogen Supply Systems (revision of ANSI/CGA H-5-2014) – comment due August 11
  • BSR/CGA P-18-202x, Standard for Bulk Inert Gas Systems (revision of ANSI/CGA P-18-2013) – comment due August 18

CSA

  • BSR NGV 4.8/CSA 12.8-202x, Natural gas vehicle fueling station compressor packages (revision of ANSI NGV 4.8/CSA 12.8-202x) – comment due July 20
  • BSR/IAS NGV 4.4/CSA 12.54-202x, Breakaway devices for natural gas dispensing hoses and systems (revision of ANSI/IAS NGV 4.4/CSA 12.54-1999 (R2019)) – comment due July 20
  • BSR/CSA Z21.47/CSA 2.3-202x, Gas-fired central furnaces (same as CSA 2.3) (revision and redesignation of ANSI Z21.47-2016) – comment due July 27
  • BSR/CSA HGV 4.10-202x, Standard for fittings for use in compressed gaseous hydrogen fueling stations (revision of ANSI/CSA HGV 4.10-2012 (R2019)) – comment due August 10

CTA

  • BSR/CTA 762-B-2008 (S202x), DTV Remodulator Specification (stabilized maintenance of ANSI/CTA 762-B-2008 (R2015)) – comment due July 20
  • BSR/CTA 109-D-2009 (S202x), Intermediate Frequencies for Entertainment Receivers (stabilized maintenance of ANSI/CTA 109-D-2009 (R2015)) – comment due July 27

ECIA

  • BSR/EIA 797-2014 (R202x), Aluminum-Electrolytic Capacitor Application Guideline (reaffirmation of ANSI/EIA 797-2014) – comment due July 6
  • BSR/EIA 944-2013 (R202x), Surface Mount Chip Bead Qualification Specification (reaffirmation of ANSI/EIA 944-2013) – comment due July 6

EOS/ESD

  • BSR/ESD SP17.1-202x, ESD Association Draft Standard Practice for the Protection of Electrostatic Discharge Susceptible Items – Process Assessment Techniques (new standard) – comment due July 27
  • BSR/ESD SP3.5-202x, ESD Association Standard Practice for the Protection of Electrostatic Discharge Susceptible Items – Test Methods for Air Assist Bar Ionizers, Soft X-Ray (Photon) Ionizers, Room Ionization Alternatives, and Non-Airflow Alpha Ionizers (new standard) – comment due August 3
  • BSR/ESD STM7.1-202x, ESD Association Standard Test Method for the Protection of Electrostatic Discharge Susceptible Items – Flooring Systems – Resistive Characterization (revision of ANSI/ESD STM7.1-2013) – comment due August 17

ESTA

  • BSR E1.54-202x, ESTA Standard for Color Communication in Entertainment Lighting (revision of ANSI E1.54-2015) – comment due July 13
  • BSR/E1.69-202x, Reporting the Low-End Dimming Performance of Entertainment Luminaires Using LED Sources (new standard) – comment due August 3

FM

  • BSR/FM 2510-202x, Flood Abatement Equipment (revision of ANSI/FM 2510-2014) – comment due July 20
  • BSR/FM 4474-202x, Evaluation of Simulated Wind Uplift Resistance of Roof Assemblies Using Static Positive and/or Negative Differential Pressures (revision of ANSI FM 4474-2004 (R2010)) – comment due August 3

HI

  • BSR/HI 3.1-3.5-202x, Rotary Pumps for Nomenclature, Definitions, Application, and Operation (revision of ANSI/HI 3.1-3.5-2015) – comment due August 3
  • BSR/HI 9.6.2-202x, Rotodynamic Pumps for Assessment of Applied Nozzle Loads (revision of ANSI/HI 9.6.2-2015) – comment due August 3

HL7

  • BSR/HL7 V26 IG CCHD, R1-202x, HL7 Version 2.6 Implementation Guide: Newborn Screening for Critical Congenital Heart Defects (CCHD), Release 1 (new standard) – comment due July 6
  • BSR/HL7 V3 PSAF, R1-202x, HL7 Version 3 Standard: Privacy and Security Architecture Framework – Trust Framework for Federated Authorization, Release 1 (new standard) – comment due July 20
  • BSR/HL7 V3 RPS, R2-2015 (R202x), HL7 Version 3 Standard: Regulated Product Submission, Release 2 (reaffirmation of ANSI/HL7 V3 RPS, R2-2015) – comment due July 20
  • BSR/HL7 V2 Conformance, R1-202x, HL7 Version 2 Specification: Conformance, Release 1 (revision and partition of ANSI/HL7 V2.9-2019) – comment due July 27
  • BSR/HL7 V26 IG EHDI, R1-202x, HL7 Version 2.6 Implementation Gude: Early Hearing Detection and Intervention (EHDI), Release 1 (new standard) – comment due August 3

IAPMO (ASSE International Chapter of IAPMO)

  • BSR/ASSE 1090-202x, Performance Requirements for Drinking Water Atmospheric Water Generators (AWG) (new standard) – comment due July 6
  • BSR/ASSE 1061-202x, Performance Requirements for Push-Fit Fittings (revision of ANSI/ASSE 1061-2015) – comment due July 13
  • BSR/ASSE 1070/ASME A112.1070/CSA B125.70-202x, Performance requirements for water temperature limiting devices (revision and redesignation of ANSI/ASSE 1070-2015/ASME A112.1070-2015/CSA B125.70-15) – comment due July 13
  • BSR/ASSE 1072-202x, Performance Requirements for Barrier Type Trap Seal Protection for Floor Drains (new standard) – comment due July 20
  • BSR/ASSE 1035-202x, Performance Requirements for Laboratory Faucet Backflow Preventers (revision of ANSI/ASSE 1035-2008) – comment due July 27
  • BSR/ASSE 1064-2006 (R202x), Performance Requirements for Backflow Prevention Assembly Field Test Kits (reaffirmation of ANSI/ASSE 1064-2006 (R2011)) – comment due August 10

IAPMO

  • BSR/IAPMO S1001.4-2015 (R202x), Energy Production Rating of Solar Heating Collectors (reaffirmation of ANSI/IAPMO S1001.4-2015) – comment due August 3

ICC

  • BSR/ICC 900-202x, Standard for Solar Water Heating Systems (revision and redesignation of ANSI/ICC 900/SRCC 300-2015) – comment due August 3
  • BSR/ICC 901-202x, Standard for Solar Thermal Collectors (revision of ANSI/ICC 901/SRCC 100-2015) – comment due August 3
  • BSR/ICC 500-202x, ICC/NSSA Standard for the Design and Construction of Storm Shelters (revision of ANSI/ICC 500-2014) – comment due August 10

IEC

All commenting is via IEC’s free online platform here.

  • IEC/IEEE 63113 ED1: Nuclear facilities – Instrumentation important to safety – Spent fuel pool instrumentation – comment due July 10
  • IEC 61000-3-3/AMD2 ED3: Amendment 2 – Electromagnetic compatibility (EMC) – Part 3-3: Limits – Limitation of voltage changes, voltage fluctuations and flicker in public low-voltage supply systems, for equipment with rated current ≤16 A per phase and not subject to conditional connection – comment due July 10
  • IEC 61924-2 ED2: Maritime navigation and radiocommunication equipment and systems – Integrated navigation systems – Part 2: Modular structure for INS – Operational and performance requirements, methods of testing and required test results – comment due July 10
  • IEC 63246-1 ED1: Configurable Car Infotainment Service(CCIS) : Part 1 – General (TA 17) – comment due July 10
  • ISO/IEC 30163 ED1: Internet of Things (IoT) – System requirements of IoT/SN technology-based integrated platform for chattel asset monitoring – comment due July 10
  • IEC 61076-3-106 ED2: Connectors for electrical and electronic equipment – Product requirements – Part 3-106: Rectangular connectors – Detail specification for protective housings for use with 8-way shielded and unshielded connectors for industrial environments incorporating the IEC 60603-7 series interface – comment due July 17
  • IEC 63171-5 ED1: Connectors for electrical and electronic equipment – Product requirements – Part 5: Detail specification for circular – comment due July 17connectors with up to 8 ways, shielded or unshielded, free and fixed connectors: mechanical mating information, pin assignment and additional requirements for type 5 – comment due July 17
  • ISO/IEC 19818-1 ED1: ISO 19818: Eye and face protection — Protection against laser radiation — Requirements and test methods – comment due July 17
  • IEC 60794-4-30 ED1: Optical Fibre Cables – Part 4-30: Aerial optical cables along electrical power lines – Family Specification for OPPC (Optical Phase Conductor) – comment due July 17
  • IEC 60545 ED2: Guideline for commissioning and operation of hydraulic turbines, pump-turbines and storage pumps – comment due July 24
  • IEC 61850-5/AMD1 ED2: Amendment 1 – Communication networks and systems for power utility automation – Part 5: Communication requirements for functions and device models – comment due July 24
  • IEC 62586-2/AMD1 ED2: Power quality measurement in power supply systems – Part 2: Functional tests and uncertainty requirements – comment due July 24
  • IEC 61788-23 ED2: Superconductivity – Part 23: Residual resistance ratio measurement- Residual resistance ratio of cavity-grade niobium superconductors – comment due July 24
  • IEC 62321-2 ED2: Determination of certain substances in electrotechnical products – Part 2: Disassembly, disjunction and mechanical sample preparation – comment due July 24
  • IEC 60050-815 ED3: International Electrotechnical Vocabulary (IEV) – Part 815: Superconductivity – comment due July 31
  • IEC 63112 ED1: Safety, functionality and classification of Photovoltaic Earth Fault Protection (PV EFP) equipment – comment due July 31
  • IEC 61189-5-501 ED1: Test methods for electrical materials, printed boards and other interconnection structures and assemblies – Part 5-501: General test methods for materials and assemblies – Surface insulation resistance (SIR) testing of solder fluxes – comment due July 31
  • IEC 61189-5-502 ED1: Test methods for electrical materials, printed boards and other interconnection structures and assemblies – Part 5-502: General test methods for materials and assemblies – Surface insulation resistance (SIR) testing of assemblies – comment due July 31
  • IEC 61936-1 ED3: Power installations exceeding 1 kV AC and 1,5 kV DC – Part 1: AC – comment due July 31
  • IEC 63000/AMD1 ED1: Technical documentation for the assessment of electrical and electronic products with respect to the restriction of hazardous substances – Amendment 1 – comment due July 31
  • IEC 62271-213 ED1: High-voltage switchgear and controlgear – Part 213: Voltage detecting and indicating system – comment due August 7
  • IEC 62271-215 Ed. 1: Phase comparator – comment due August 7
  • IEC 62595-2-5 ED1: Display lighting unit – Part 2-5: Measurement method for optical quantities of non-planar light sources – comment due August 7
  • IEC 62841-2-1/AMD1 ED1: Amendment 1 – Electric motor-operated hand-held tools, transportable tools and lawn and garden machinery – Safety – Part 2-1: Particular requirements for hand-held drills and impact drills – comment due August 7
  • IEC 60050-651/AMD1 ED2: Amendment 1 – International Electrotechnical Vocabulary (IEV) – Part 651: Live working – comment due August 14
  • IEC 60095-4 ED3: Lead-acid starter batteries – Part 4: Dimensions of batteries for heavy vehicles – comment due August 14
  • IEC 60095-2 ED5: Lead-acid starter batteries – Part 2: Dimensions of batteries and dimensions and marking of terminals – comment due August 14
  • IEC 62040-1/AMD1 ED2: Uninterruptible power systems (UPS) – Part 1: Safety requirements – comment due August 14
  • IEC 62563-1/AMD2 ED1: Amendment 2 – Medical electrical equipment – Medical image display systems – Part 1: Evaluation methods – comment due August 14
  • IEC 61280-2-8 ED2: Fibre optic communication subsystem test procedures – Digital systems – Part 2-8: Determination of low BER using Q-factor measurements – comment due August 14
  • IEC 60068-2-20 ED6: Environmental testing – Part 2-20: Tests – Test T: Test methods for solderability and resistance to soldering heat of devices with leads – comment due August 14
  • IEC 60068-2-38 ED3: Environmental testing – Part 2-38: Tests – Test Z/AD: Composite temperature/humidity cyclic test – comment due August 14
  • ISO/IEC 20924 ED2: Internet of Things (IoT) – Vocabulary – comment due August 14
  • IEC 63154 ED1: Maritime navigation and radiocommunication equipment and systems – Cybersecurity – General requirements, methods of testing and required test results – comment due August 21
  • IEC 60794-1-2 ED5: Optical fibre cables – Part 1-2: Generic specification – Basic optical cable test procedures – General guidance – comment due August 21
  • IEC 61753-111-8 ED2: Fibre optic interconnecting devices and passive components – Performance standard – Part 111-8: Sealed closures for Category G – Ground – comment due August 21
  • IEC 61300-2-10 ED3: Fibre optic interconnecting devices and passive components – Basic test and measurement procedures – Part 2-10: Tests – Crush and load resistance – comment due August 21
  • IEC 62893-1/AMD1 ED1: Amendment 1 – Charging cables for electric vehicles for rated voltages up to and including 0,6/1 kV – Part 1: General requirements – comment due August 28
  • IEC 62372 ED2: Nuclear instrumentation – Housed scintillators – Measurement methods of light output and intrinsic resolution – comment due August 28
  • IEC 62680-1-3 ED4: Universal serial bus interfaces for data and power – Part 1-3: Common components – USB Type-C® Cable and Connector Specification – comment due August 28
  • IEC 62680-1-2 ED5: Universal serial bus interfaces for data and power – Part 1-2: Common components – USB Power Delivery specification – comment due August 28

IEEE

  • BSR/IEEE 1863-202x, Guide for Overhead AC Transmission Line Design (new standard) – comment due July 21
  • BSR/IEEE 844.1-202x, Standard for Skin Effect Trace Heating of Pipelines, Vessels, Equipment, and Structures – General, Testing, Marking, and Documentation Requirements (new standard) – comment due August 25
  • BSR/IEEE 844.2-202x, Standard for Skin Effect Trace Heating of Pipelines, Vessels, Equipment, and Structures – Application Guide for Design, Installation, Testing, Commissioning, and Maintenance (new standard) – comment due August 25
  • BSR/IEEE 844.3-202x, Standard for Impedance Heating of Pipelines and Equipment – General, Testing, Marking, and Documentation Requirements (new standard) – comment due August 25
  • BSR/IEEE 844.4-202x, Standard for Impedance Heating of Pipelines and Equipment – Application Guide for Design, Installation, Testing, Commissioning and Maintenance (new standard) – comment due August 25
  • BSR/IEEE C95.1-202x, Standard for Safety Levels with Respect to Human Exposure to Electric, Magnetic, and Electromagnetic Fields, 0 Hz to 300 GHz (revision of ANSI/IEEE C95.1-2006) – comment due August 25

IKECA

  • BSR/IKECA C10-202x, Standard for the Methodology for Cleaning Commercial Kitchen Exhaust Systems (revision of ANSI/IKECA C10-2016) – comment due July 6

ISO

(note: ISO has over 366 standards open for public comment, we’ve included a selection of these in this list. For full listing, click here.)

  • ISO/DIS 29991 Language learning services — Requirements
  • ISO/DIS 7840 Small craft — Fire-resistant fuel hoses
  • ISO/DIS 23449 Corrosion of metals and alloys — Multielectrode arrays for corrosion measurement
  • ISO/DIS 23512 Plastics — Joining of thermoplastic moulded components — Specification of variables for thermal joining processes
  • ISO/DIS 21364-22 Domestic gas cooking appliances — Safety — Part 22: Particular requirements for ovens and compartment grills
  • ISO/DIS 24016 Jewellery and precious metals — Grading polished diamonds — Terminology, classification and test methods
  • ISO/DIS 31110 Wheeled child conveyances — Pushchairs and prams — Requirements and test methods
  • ISO/DIS 14931 Leather — Guide to the selection of leather for apparel (excluding furs)
  • ISO/DIS 8373 Robotics — Vocabulary
  • ISO/DIS 21543 Milk and milk products — Guidelines for the application of near infrared spectrometry
  • ISO/DIS 14557 Fire-fighting hoses — Rubber and plastics suction hoses and hose assemblies
  • ISO/DIS 23865 Non-destructive testing — Ultrasonic testing — General use of full matrix capture / total focusing technique (FMC/TFM)
  • ISO/DIS 22705-1 Springs — Measurement and test parameters — Part 1: Cold formed cylindrical helical compression springs
  • ISO/DIS 15223-1 Medical devices — Symbols to be used with medical device labels, labelling and information to be supplied — Part 1: General requirements

ITI

  • INCITS/ISO 19101-2:2018 [202x], Geographic Information – Reference Model – Part 2: Imagery (identical national adoption of ISO 19101-2:2018) – comment due July 14
  • INCITS/ISO 19115-1:2014/AM 1:2018 [202x], Geographic information – Metadata – Part 1: Fundamentals – Amendment 1 (identical national adoption of ISO 19115-1:2014/AM 1:2018) – comment due July 14
  • INCITS/ISO 19123-2:2018 [202x], Geographic Information – Schema for Coverage Geometry and Functions – Part 2: Coverage Implementation Schema (identical national adoption of ISO 19123-2:2018) – comment due July 14
  • INCITS/ISO 19130-1:2018 [202x], Geographic Information – Imagery Sensor Models for Geopositioning – Part 1: Fundamentals (identical national adoption of ISO 19130-1:2018) – comment due July 14
  • INCITS/ISO 19136-1:2020 [202x], Geographic Information – Geography Markup Language (GML) – Part 1: Fundamentals (identical national adoption of ISO 19136-1:2020 and revision of INCITS/ISO/IEC 19136:2007 [R2015]) – comment due July 14
  • INCITS/ISO 19150-4:2019 [202x], Geographic Information – Ontology – Part 4: Service Ontology (identical national adoption of ISO 19150-4:2019) – comment due July 14
  • INCITS/ISO 19150-2:2015/AM 1:2019 [202x], Geographic information – Ontology – Part 2: Rules for developing ontologies in the Web Ontology Language (OWL) – Amendment 1 (identical national adoption of ISO 19150-2:2015/AM 1:2019) – comment due July 14
  • INCITS/ISO 19160-3:2020 [202x], Addressing – Part 3: Address Data Quality (identical national adoption of ISO 19160-3:2020) – comment due July 14
  • INCITS/ISO 19161-1:2020 [202x], Geographic Information – Geodetic References – Part 1: International Terrestrial Reference System (ITRS) (identical national adoption of ISO 19161-1:2020) – comment due July 14
  • INCITS/ISO 19165-1:2018 [202x], Geographic Information – Preservation of Digital Data and Metadata – Part 1: Fundamentals (identical national adoption of ISO 19165-1:2018) – comment due July 14
  • INCITS/ISO 19111:2019 [202x], Geographic Information – Referencing by Coordinates (identical national adoption of ISO 19111:2019 and revision of INCITS/ISO 19111:2007 [R2017] – comment due July 14
  • INCITS/ISO 19127:2019 [202x], Geographic Information – Geodetic Register (identical national adoption of ISO 19127:2019) – comment due July 14
  • INCITS/ISO 19146:2018 [202x], Geographic Information – Cross-Domain Vocabularies (identical national adoption of ISO 19146:2018 and revision of INCITS/ISO 19146:2018 [202x]) – comment due July 14
  • INCITS/ISO 19162:2019 [202x], Geographic Information – Well-Known Text Representation of Coordinate Reference Systems (identical national adoption of ISO 19162:2019 and revision of INCITS/ISO 19162:2015 [2017]) – comment due July 14
  • INCITS/ISO 19157:2013/AM 1:2018 [202x], Geographic information – Data quality – Amendment 1: Describing data quality using coverages (identical national adoption of ISO 19157:2013/AM 1:2018) – comment due July 14
  • INCITS/ISO/IEC 7811-2:2018 [202x], Identification Cards – Recording Technique – Part 2: Magnetic Stripe: Low Coercivity (identical national adoption of ISO/IEC 7811-2:2018 and revision of INCITS/ISO/IEC 7811-2:2014 [2016]) – comment due July 14
  • INCITS/ISO/IEC 7816-8:2019 [202x], Identification Cards – Integrated Circuit Cards – Part 8: Commands and Mechanisms for Security Operations (identical national adoption of ISO/IEC 7816-8:2019 and revision of INCITS/ISO/IEC 7816-8:2016 [2019]) – comment due July 14
  • INCITS/ISO/IEC 7816-15:2016/AM 1:2018 [202x], Identification cards – Integrated circuit cards – Part 15: Cryptographic information application – Amendment 1 (identical national adoption of ISO/IEC 7816-15:2016/AM 1:2018) – comment due July 14
  • INCITS/ISO/IEC 10373-3:2018 [202x], Identification Cards – Test Methods – Part 3: Integrated Circuit Cards with Contacts and Related Interface Devices (identical national adoption of ISO/IEC 10373-3:2018 and revision of INCITS/ISO/IEC 10373-3:2010 [R2016]) – comment due July 14
  • INCITS/ISO/IEC 10373-7:2019 [202x], Cards and Security Devices for Personal Identification – Test Methods – Part 7: Contactless Vicinity Objects (identical national adoption of ISO/IEC 10373-7:2019 and revision of INCITS/ISO/IEC 10373-7:2008 [R2016]) – comment due July 14
  • INCITS/ISO/IEC 10373-8:2011 [202x], Identification Cards – Test Methods – Part 8: USB-ICC (identical national adoption of ISO/IEC 10373-8:2011) – comment due July 14
  • INCITS/ISO/IEC 10373-9:2011 [202x], Identification Cards – Test Methods – Part 9: Optical Memory Cards – Holographic Recording Method (identical national adoption of ISO/IEC 10373-9:2011) – comment due July 14
  • INCITS/ISO/IEC 14443-3:2018 [202x], Cards and Security Devices for Personal Identification – Contactless Proximity Objects – Part 3: Initialization and Anticollision (identical national adoption of ISO/IEC 14443-3:2018 and revision of INCITS/ISO/IEC 14443-3:2016 [2016]) – comment due July 14
  • INCITS/ISO/IEC 14443-4:2018 [202x], Cards and Security Devices for Personal Identification – Contactless Proximity Objects – Part 4: Transmission Protocol (identical national adoption of ISO/IEC 14443-4:2018 and revision of INCITS/ISO/IEC 14443-4:2016 [2016]) – comment due July 14
  • INCITS/ISO/IEC 15693-1:2018 [202x], Cards and Security Devices for Personal Identification – Contactless Vicinity Objects – Part 1: Physical Characteristics (identical national adoption of ISO/IEC 15693-1:2018 and revision of INCITS/ISO/IEC 15693-1:2010 [R2016]) – comment due July 14
  • INCITS/ISO/IEC 15693-2:2019 [202x], Cards and Security Devices for Personal Identification – Contactless Vicinity Objects – Part 2: Air Interface and Initialization (identical national adoption of ISO/IEC 15693-2:2019 and revision of INCITS/ISO/IEC 15693-2:2006 [R2016]) – comment due July 14
  • INCITS/ISO/IEC 15693-3:2019 [202x], Cards and Security Devices for Personal Identification – Contactless Vicinity Objects – Part 3: Anticollision and Transmission Protocol (identical national adoption of ISO/IEC 15693-3:2019 and revision of INCITS/ISO/IEC 15693-3:2009 [R2016]) – comment due July 14
  • INCITS/ISO/IEC 18013-3:2017 [202x], Information Technology – Personal Identification – ISO-Compliant Driving Licence – Part 3: Access Control, Authentication and Integrity Validation (identical national adoption of ISO/IEC 18013-3:2017 and revision of INCITS/ISO/IEC 18013-3:2009 [R2016]) – comment due July 14
  • INCITS/ISO/IEC 18013-4:2019 [202x], Personal Identification – ISO-Compliant Driving Licence – Part 4: Test Methods (identical national adoption of ISO/IEC 18013-4:2019) – comment due July 14
  • INCITS/ISO/IEC 20071-11:2019 [202x], Information Technology – User Interface Component Accessibility – Part 11: Guidance on Text Alternatives for Images (identical national adoption of ISO/IEC 20071-11:2019) – comment due July 14
  • INCITS/ISO/IEC 29794-4:2017 [202x], Information Technology – Biometric Sample Quality – Part 4: Finger Image Data (identical national adoption of ISO/IEC 29794-4:2017) – comment due July 14
  • INCITS/ISO/IEC 7810:2019 [202x], Identification Cards – Physical Characteristics (identical national adoption of ISO/IEC 7810:2019 and revision of INCITS/ISO/IEC 7810:2003 [R2018]) – comment due July 14
  • INCITS/ISO/IEC 19286:2018 [202x], Identification Cards – Integrated Circuit Cards – Privacy-Enhancing Protocols and Services (identical national adoption of ISO/IEC 19286:2018) – comment due July 14
  • INCITS/ISO/IEC 24787:2018 [202x], Information Technology – Identification Cards – On-Card Biometric Comparison (identical national adoption of ISO/IEC 24787:2018) – comment due July 14
  • INCITS/ISO/IEC 12087-2:1994 [S202x], Information Technology – Computer Graphics And Image Processing – Image Processing And Interchange (IPI) – Functional Specification – Part 2: Programmers Imaging Kernel System Application Programme Interface (stabilized maintenance of INCITS/ISO/IEC 12087-2:1994 [R2014])) – comment due July 21
  • INCITS/ISO/IEC 12089:1997 [S202x], Information Technology – Computer Graphics and Image Processing – Encoding for the Image Interchange Facility (IIF) (stabilized maintenance of INCITS/ISO/IEC 12089:1997 [R2014]) – comment due July 21
  • BSR INCITS 506-202x, Information technology – SBC-4 (SCSI Block Commands – 4) (new standard) – comment due August 25
  • INCITS 83-1995 [R202x], Information Systems – ISO Registration According to ISO 2375 – ANSI Sponsorship Procedures (reaffirmation of INCITS 83-1995 [R2015]) – comment due August 25
  • INCITS 322-2015 [R202x], Information Technology – Card Durability Test Methods (reaffirmation of INCITS 322-2015) – comment due August 25
  • INCITS 335-2000 [R202x], Information technology – Small Computer System Interface (SCSI-3) Stream Commands (SSC) (reaffirmation of INCITS 335-2000 [R2015]) – comment due August 25
  • INCITS 403-2005 [R202x], Information technology – Automation/Drive Interface – Commands (ADC) (reaffirmation of INCITS 403 -2005 [R2015]) – comment due August 25
  • INCITS 406-2005 [R202x], Information technology – Automation/Drive Interface – Transport Protocol (ADT) (reaffirmation of INCITS 406-2005 [R2015]) – comment due August 25
  • INCITS 452-2009/AM 1:2010 [R202x], Information Technology – AT Attachment-8 ATA/ATAPI Command Set (ATA8-ACS) – Amendment 1 (reaffirmation of INCITS 452-2009/AM 1:2010 [R2015]) – comment due August 25
  • INCITS 457-2010 [R202x], Information technology – Serial Attached SCSI – 2 (SAS-2) (reaffirmation of INCITS 457-2010 [R2015]) – comment due August 25
  • INCITS 465-2010 [R202x], Information technology – SCSI/ATA Translation – 2 (SAT-2) (reaffirmation of INCITS 465-2010 [R2015]) – comment due August 25
  • INCITS 468-2010 [R202x], Information technology – Multi-media Command Set – 6 (MMC-6) (reaffirmation of INCITS 468-2010 [R2015]) – comment due August 25
  • INCITS 469-2015 [R202x], Information Technology – Open Virtualization Format (OVF) Specification (reaffirmation of INCITS 469 -2015) – comment due August 25
  • INCITS 471-2010 [R202x], Information Technology – USB Attached SCSI (UAS) (reaffirmation of INCITS 471-2010 [R2015]) – comment due August 25
  • INCITS 480-2011/AM 1-2015 [R202x], Information Technology – BIOS Enhanced Disk Drive Specification – 4 (EDD-4) – Amendment 1 (reaffirmation of INCITS 480:2011/AM 1-2015) – comment due August 25
  • INCITS 492-2015 [R202x], Information technology – SAS Protocol Layer (SPL-3) (reaffirmation of INCITS 492-2015) – comment due August 25
  • INCITS 496-2012/AM1-2015 [R202x], Information Technology – Fibre Channel – Security Protocols – 2/Amendment 1 -(FC-SP-2/AM1) (reaffirmation of INCITS 496-2012/AM1-2015) – comment due August 25
  • INCITS 512-2015 [R202x], Information Technology – Fibre Channel – Physical Interface-6 (FC-PI-6) (reaffirmation of INCITS 512 -2015) – comment due August 25
  • INCITS 513-2015 [R202x], Information technology – SCSI Primary Commands – 4 (SPC-4) (reaffirmation of INCITS 513-2015) – comment due August 25
  • INCITS 517-2015 [R202x], Information technology – SCSI/ATA Translation – 3 (SAT-3) (reaffirmation of INCITS 517-2015) – comment due August 25
  • INCITS 522-2014 [R202x], Information Technology – ATA/ATAPI Command Set – 3 (ACS-3) (reaffirmation of INCITS 522-2014) – comment due August 25
  • INCITS 410:2015 [R202x], Information Technology – Identification Cards – Limited Use (LU), Proximity Integrated Circuit Card (PICC) (reaffirmation of INCITS 410:2015) – comment due August 25
  • INCITS 440:2015 [R202x], Information Technology – Card Durability/Service Life (reaffirmation of INCITS 440:2015) – comment due August 25
  • INCITS 442:2010 [R202x], Information Technology – Biometric Identity Assurance Services (BIAS) (reaffirmation of INCITS 442:2010 [R2015]) – comment due August 25
  • INCITS 378:2009/AM 1:2010 [R202x], Information Technology – Finger Minutiae Format for Data Interchange – Amendment 1 (reaffirmation of INCITS 378:2009/AM 1:2010 [R2015]) – comment due August 25
  • INCITS/ISO 19125-1:2004 [R202x], Geographic Information – Simple Feature Access – Part 1: Common Architecture (reaffirmation of INCITS/ISO 19125-1:2004 [R2015]) – comment due August 25
  • INCITS/ISO 19125-2:2004 [R202x], Geographic Information – Simple Feature Access – Part 2: SQL Option (reaffirmation of INCITS/ISO 19125-2:2004 [R2015]) – comment due August 25
  • INCITS/ISO 19144-1:2009 [R202x], Geographic information – Classification systems – Part 1: Classification system structure (reaffirmation of INCITS/ISO 19144-1:2009 [R2015]) – comment due August 25
  • INCITS/ISO 19106:2004 [R202x], Geographic Information – Profiles (reaffirmation of INCITS/ISO 19106:2004 [R2015]) – comment due August 25
  • INCITS/ISO 19128:2005 [R202x], Geographic Information – Web Map Server Interface (reaffirmation of INCITS/ISO 19128:2005 [R2015]) – comment due August 25
  • INCITS/ISO 6709:2008/COR 1:2009 [R202x], Standard representation of geographic point location by coordinates (reaffirmation of INCITS/ISO 6709:2008/COR 1:2009 [R2015]) – comment due August 25
  • INCITS/ISO 19108:2002/COR 1:2006 [R202x], Geographic Information – Temporal Schema – Technical Corrigendum 1 (reaffirmation of INCITS/ISO 19108:2002/COR 1:2006 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 8632-1:1999/COR 1:2006 [R202x], Information Technology – Computer Graphics – Metafile for the Storage and Transfer of Picture Description Information – Part 1: Functional Specification – Technical Corrigendum 1 (reaffirmation of INCITS/ISO/IEC 8632-1:1999/COR 1:2006 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 8632-1:1999/COR 2:2007 [R202x], Information Technology – Computer Graphics – Metafile for the Storage and Transfer of Picture Description Information – Part 1: Functional Specification – Technical Corrigendum 2 (reaffirmation of INCITS/ISO/IEC 8632-1:1999/COR 2:2007 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 8859-2:1999 [R202x], Information Technology – 8-Bit Single-Byte Coded Graphic Character Sets – Part 2: Latin Alphabet No. 2 (reaffirmation of INCITS/ISO/IEC 8859-2:1999 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 8859-3:1999 [R202x], Information technology – 8-bit single-byte coded graphic character sets – Part 3: Latin alphabet No. 3 (reaffirmation of INCITS/ISO/IEC 8859-3:1999 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 8859-5:1999 [R202x], Information Technology – 8-Bit Single-Byte Coded Graphic Character Sets – Part 5: Latin/Cyrillic Alphabet (reaffirmation of INCITS/ISO/IEC 8859-5:1999 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 8859-6:1999 [R202x], Information Technology – 8-Bit Single-Byte Coded Graphic Character Sets – Part 6: Latin/Arabic Alphabet (reaffirmation of INCITS/ISO/IEC 8859-6:1999 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 8859-8:1999 [R202x], Information Technology – 8-Bit Single-Byte Coded Graphic Character Sets – Part 8: Latin/Hebrew Alphabet (reaffirmation of INCITS/ISO/IEC 8859-8:1999 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 8859-16:2001 [R202x], Information Technology – 8-Bit Single-Byte Coded Graphic Character Sets – Part 16: Latin Alphabet No. 10 (reaffirmation of INCITS/ISO/IEC 8859-16:2001 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 9593-1:1990/COR 1:1993 [R202x], Information processing systems – Computer graphics – Programmers Hierarchical Interactive Graphics System (PHIGS) language bindings – Part 1: FORTRAN – Technical Corrigendum 1 (reaffirmation of INCITS/ISO/IEC 9593-1:1990/COR 1:1993 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 9593-1:1990/COR 2:1994 [R202x], Information Processing Systems – Computer Graphics – Programmers Hierarchical Interactive Graphics System (PHIGS) Language Bindings – Part 1: FORTRAN – Technical Corrigendum 2 (reaffirmation of INCITS/ISO/IEC 9593-1:1990/COR 2:1994 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 9593-3:1990/COR 1:1993 [R202x], Information Technology – Computer Graphics – Programmers Hierarchical Interactive Graphics System (PHIGS) Language Bindings – Part 3: ADA – Technical Corrigendum 1 (reaffirmation of INCITS/ISO/IEC 9593-3:1990/COR 1:1993 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 9593-3:1990/COR 2:1994 [R202x], Information Technology – Computer Graphics – Programmers Hierarchical Interactive Graphics System (PHIGS) Language Bindings – Part 3: ADA – Technical Corrigendum 2 (reaffirmation of INCITS/ISO/IEC 9593-3:1990/COR 2:1994 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 9593-4:1991/COR 1:1994 [R202x], Information technology – Computer graphics – Programmers Hierarchical Interactive Graphics System (PHIGS) language bindings – Part 4: C – Technical Corrigendum 1 (reaffirmation of INCITS/ISO/IEC 9593-4:1991/COR1:1994 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 9798-5:2009 [R202x], Information Technology – Security Techniques – Entity Authentication – Part 5: Mechanisms Using Zero-Knowledge Techniques (reaffirmation of INCITS/ISO/IEC 9798-5:2009 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 9834-6:2005 [R202x], Information technology – Open Systems Interconnection – Procedures for the operation of OSI Registration Authorities: Registration of application processes and application entities (reaffirmation of INCITS/ISO/IEC 9834-6:2005 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 9834-9:2008 [R202x], Information technology – Open Systems Interconnection – Procedures for the operation of OSI Registration Authorities: Registration of object identifier arcs for applications and services using tag-based identification (reaffirmation of INCITS/ISO/IEC 9834-9:2008 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 12087-2:1994/COR 1:1997 [R202x], Information Technology – Computer Graphics and Image Processing – Image Processing and Interchange (IPI) – Functional Specification – Part 2: Programmers Imaging Kernel System Application Programme Interface – Technical Corrigendum 1 (reaffirmation of INCITS/ISO/IEC 12087-2:1994/COR 1:1997 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 12087-5:1998/COR 1:2001 [R202x], Information Technology – Computer Graphics and Image Processing – Image Processing and Interchange (IPI) – Functional Specification – Part 5: Basic Image Interchange Format (BIIF) – Technical Corrigendum 1 (reaffirmation of INCITS/ISO/IEC 12087-5:1998/COR 1:2001 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 12087-5:1998/COR 2:2002 [R202x], Information Technology – Computer Graphics and Image Processing – Image Processing and Interchange (IPI) – Functional Specification – Part 5: Basic Image Interchange Format (BIIF) – Technical Corrigendum 2 (reaffirmation of INCITS/ISO/IEC 12087-5:1998/COR 2:2002 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 13888-3:2009 [R202x], Information technology – Security techniques – Non-repudiation – Part 3: Mechanisms using asymmetric techniques (reaffirmation of INCITS/ISO/IEC 13888-3:2009 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 14496-10:2014 [R202x], Information technology – Coding of audio-visual objects – Part 10: Advanced Video Coding (reaffirmation of INCITS/ISO/IEC 14496-10:2014 [2015]) – comment due August 25
  • INCITS/ISO/IEC 14772-1:1997 [R202x], Information Technology – Computer Graphics and Image Processing – The Virtual Reality Modeling Language – Part 1: Functional Specification and UTF-8 Encoding (reaffirmation of INCITS/ISO/IEC 14772-1:1997 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 14772-1:1997/AM 1:2003 [R202x], Information Technology – Computer Graphics and Image Processing – The Virtual Reality Modeling Language – Part 1: Functional Specification and UTF-8 Encoding – Amendment 1 (reaffirmation of INCITS/ISO/IEC 14772-1:1997/AM 1:2003 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 14776-414:2009 [R202x], Information technology – Small Computer System Interface (SCSI) – Part 414: SCSI Architecture Model-4 (SAM-4) (reaffirmation of INCITS/ISO/IEC 14776-414:2009 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 14888-1:2008 [R202x], Information technology – Security techniques – Digital signatures with appendix – Part 1: General (reaffirmation of INCITS/ISO/IEC 14888-1:2008 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 15944-7:2009 [R202x], Information technology – Business Operational View – Part 7: eBusiness vocabulary (reaffirmation of INCITS/ISO/IEC 15944-7:2009 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 18014-1:2008 [R202x], Information technology – Security techniques – Time-stamping services – Part 1: Framework (reaffirmation of INCITS/ISO/IEC 18014-1:2008 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 18014-2:2009 [R202x], Information technology – Security techniques – Time-stamping services – Part 2: Mechanisms producing independent tokens (reaffirmation of INCITS/ISO/IEC 18014-2:2009 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 18014-3:2009 [R202x], Information Technology – Security Techniques – Time-Stamping Services – Part 3: Mechanisms Producing Linked Tokens (reaffirmation of INCITS/ISO/IEC 18014-3:2009 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 19785-4:2010 [R202x], Information Technology – Common Biometric Exchange Formats Framework – Part 4: Security Block Format Specifications (reaffirmation of INCITS/ISO/IEC 19785-4:2010 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 19785-2:2006/AM 1:2010 [R202x], Information Technology – Common Biometric Exchange Formats Framework – Part 2: Procedures for the Operation of the Biometric Registration Authority – Amendment 1: Additional Registrations (reaffirmation of INCITS/ISO/IEC 19785-2:2006/AM 1:2010 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 19794-2:2005/COR 1:2009 [R202x], Information technology – Biometric data interchange formats – Part 2: Finger minutiae data – Technical Corrigendum 1 (reaffirmation of INCITS/ISO/IEC 19794-2:2005/COR 1:2009 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 19794-2:2005/AM 1:2010 [R202x], Information technology – Biometric data interchange formats – Part 2: Finger minutiae data – Amendment 1: Detailed description of finger minutiae location, direction, and type (reaffirmation of INCITS/ISO/IEC 19794-2:2005/AM 1:2010 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 19794-7:2007/COR 1:2009 [R202x], Information technology – Biometric data interchange formats – Part 7: Signature/sign time series data – Technical Corrigendum 1 (reaffirmation of INCITS/ISO/IEC 19794-7:2007/COR 1:2009 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 19794-11:2013/AM 1:2014 [R202x], Information technology – Biometric data interchange formats – Part 11: Signature/sign processed dynamic data – Amendment 1: Conformance test assertions (reaffirmation of INCITS/ISO/IEC 19794-11:2013/Amd 1:2014 (2015)) – comment due August 25
  • INCITS/ISO/IEC 19794-2:2005/Amd 1:2010/Cor 2:2014 [R202x], Information technology – Biometric data interchange formats – Part 2: Finger minutiae data – Amendment 1: Detailed description of finger minutiae location, direction and type – Technical Corrigendum 2 (reaffirmation of INCITS/ISO/IEC 19794-2:2005/Amd 1:2010/Cor 2:2014 [2015]) – comment due August 25
  • INCITS/ISO/IEC 21000-7:2007 [R202x], Information technology – Multimedia framework (MPEG-21) – Part 7: Digital Item Adaptation (reaffirmation of INCITS/ISO/IEC 21000-7:2007 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 23360-1:2006 [R202x], Linux Standard Base (LSB) Core Specification 3.1 – Part 1: Generic Specification (reaffirmation of INCITS/ISO/IEC 23360-1:2006 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 23360-2:2006 [R202x], Linux Standard Base (LSB) Core Specification 3.1 – Part 2: Specification for IA32 Architecture (reaffirmation of INCITS/ISO/IEC 23360-2:2006 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 23360-3:2006 [R202x], Linux Standard Base (LSB) Core Specification 3.1 – Part 3: Specification for IA64 Architecture (reaffirmation of INCITS/ISO/IEC 23360-3:2006 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 23360-4:2006 [R202x], Linux Standard Base (LSB) Core Specification 3.1 – Part 4: Specification for AMD64 Architecture (reaffirmation of INCITS/ISO/IEC 23360-4:2006 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 23360-5:2006 [R202x], Linux Standard Base (LSB) Core Specification 3.1 – Part 5: Specification for PPC32 Architecture (reaffirmation of INCITS/ISO/IEC 23360-5:2006 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 23360-6:2006 [R202x], Linux Standard Base (LSB) Core Specification 3.1 – Part 6: Specification for PPC64 Architecture (reaffirmation of INCITS/ISO/IEC 23360-6:2006 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 23360-7:2006 [R202x], Linux Standard Base (LSB) Core Specification 3.1 – Part 7: Specification for S390 Architecture (reaffirmation of INCITS/ISO/IEC 23360-7:2006 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 23360-8:2006 [R202x], Linux Standard Base (LSB) Core Specification 3.1 – Part 8: Specification for S390X Architecture (reaffirmation of INCITS/ISO/IEC 23360-8:2006 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 24713-3:2009 [R202x], Information technology – Biometric profiles for interoperability and data interchange – Part 3: Biometrics-based verification and identification of seafarers (reaffirmation of INCITS/ISO/IEC 24713-3:2009 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 24824-1:2007 [R202x], Information technology – Generic applications of ASN.1: Fast infoset (reaffirmation of INCITS/ISO/IEC 24824-1:2007 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 24824-2:2006 [R202x], Information technology – Generic applications of ASN.1: Fast Web Services (reaffirmation of INCITS/ISO/IEC 24824-2:2006 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 24824-3:2008 [R202x], Information technology – Generic applications of ASN.1: Fast infoset security (reaffirmation of INCITS/ISO/IEC 24824-3:2008 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 29109-1:2009 [R202x], Information technology – Conformance testing methodology for biometric data interchange formats defined in ISO/IEC 19794 – Part 1: Generalized conformance testing methodology (reaffirmation of INCITS/ISO/IEC 29109-1:2009 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 29109-2:2010 [R202x], Information technology – Conformance testing methodology for biometric data interchange formats defined in ISO/IEC 19794 – Part 2: Finger minutiae data (reaffirmation of INCITS/ISO/IEC 29109-2:2010 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 29109-4:2010 [R202x], Information technology – Conformance testing methodology for biometric data interchange formats defined in ISO/IEC 19794 – Part 4: Finger image data (reaffirmation of INCITS/ISO/IEC 29109-4:2010 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 2382:2015 [R202x], Information technology – Vocabulary (reaffirmation of INCITS/ISO/IEC 2382:2015 [2015]) – comment due August 25
  • INCITS/ISO/IEC 9496:2003 [R202x], CHILL – The ITU-T Programming Language (reaffirmation of INCITS/ISO/IEC 9496:2003 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 10747:1994 [R202x], Information technology – Telecommunications and information exchange between systems – Protocol for exchange of inter-domain routeing information among intermediate systems to support forwarding of ISO 8473 PDUs (reaffirmation of INCITS/ISO/IEC 10747:1994 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 14977:1996 [R202x], Information Technology – Syntactic Metalanguage – Extended BNF (reaffirmation of INCITS/ISO/IEC 14977:1996 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 15145:1997 [R202x], Information technology Programming languages – FORTH (reaffirmation of INCITS/ISO/IEC 15145:1997 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 16509:1999 [R202x], Information technology – Year 2000 terminology (reaffirmation of INCITS/ISO/IEC 16509:1999 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 18026:2009 [R202x], Information Technology – Spatial Reference Model (SRM) (reaffirmation of INCITS/ISO/IEC 18026:2009 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 18092:2013 [R202x], Information Technology – Telecommunications and Information Exchange between Systems – Near Field Communication – Interface and Protocol (NFCIP-1) (reaffirmation of INCITS/ISO/IEC 18092:2013 [2015]) – comment due August 25
  • INCITS/ISO/IEC 21481:2012 [R202x], Information technology – Telecommunications and information exchange between systems – Near Field Communication Interface and Protocol -2 (NFCIP-2) (reaffirmation of INCITS/ISO/IEC 21481:2012 [2015]) – comment due August 25
  • INCITS/ISO/IEC 22536:2013 [R202x], Information technology – Telecommunications and information exchange between systems – Near Field Communication Interface and Protocol (NFCIP-1) – RF interface test methods (reaffirmation of INCITS/ISO/IEC 22536:2013 [2015]) – comment due August 25
  • INCITS/ISO/IEC 22537:2006 [R202x], Information technology – ECMAScript for XML (E4X) specification (reaffirmation of INCITS/ISO/IEC 22537:2006 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 23917:2005 [R202x], Information technology – Telecommunications and information exchange between systems – NFCIP-1 – Protocol test methods (reaffirmation of INCITS/ISO/IEC 23917:2005 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 24747:2009 [R202x], Information technology – Programming languages, their environments and system software interfaces – Extensions to the C library to support mathematical special functions (reaffirmation of INCITS/ISO/IEC 24747:2009 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 25436:2006 [R202x], Information technology – Eiffel: Analysis, Design and Programming Language (reaffirmation of INCITS/ISO/IEC 25436:2006 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 28361:2007 [R202x], Information technology – Telecommunications and information exchange between systems – Near Field Communication Wired Interface (NFC-WI) (reaffirmation of INCITS/ISO/IEC 28361:2007 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 29141:2009 [R202x], Information technology – Biometrics – Tenprint capture using biometric application programming interface (BioAPI) (reaffirmation of INCITS/ISO/IEC 29141:2009 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 10747:1994/AM 1:1996 [R202x], Information technology – Telecommunications and information exchange between systems – Protocol for exchange of inter-domain routeing information among intermediate systems to support forwarding of ISO 8473 PDUs – Amendment 1: Implementation conformance statement proformas (reaffirmation of INCITS/ISO/IEC 10747:1994/AM 1:1996 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 10747:1994/COR 1:1996 [R202x], Information technology – Telecommunications and information exchange between systems – Protocol for exchange of inter-domain routeing information among intermediate systems to support forwarding of ISO 8473 PDUs – Technical Corrigendum 1 (reaffirmation of INCITS/ISO/IEC 10747:1994/COR 1:1996 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 26300:2006/COR 3:2014 [R202x], Information technology – Open Document for Office Applications (OpenDocument) v1.0 – Technical Corrigendum 3 (reaffirmation of INCITS/ISO/IEC 26300:2006/COR 3:2014 [2015]) – comment due August 25
  • INCITS/ISO/IEC 26300:2006/AM 1:2012/COR 1:2014 [R202x], Information technology – Open Document Format for Office Applications (OpenDocument) v1.0 – Amendment 1: Open Document Format for Office Applications (OpenDocument) v1.1 – Technical Corrigendum 1 (reaffirmation of INCITS/ISO/IEC 26300:2006/Amd 1:2012/Cor 1:2014 [2015]) – comment due August 25
  • INCITS 461-2010 [S202x], Information technology – Fibre Channel – Switch Fabric – 5 (FC-SW-5) (stabilized maintenance of INCITS 461-2010 [R2015]) – comment due August 25
  • INCITS 462-2010 [S202x], Information Technology – Fibre Channel – Backbone – 5 (FC-BB-5) (stabilized maintenance of INCITS 462-2010 [R2015]) – comment due August 25
  • INCITS 463-2010 [S202x], Information Technology – Fibre Channel – Generic Services – 6 (FC-GS-6) (stabilized maintenance of INCITS 463-2010 [R2015]) – comment due August 25
  • INCITS 464-2010 [S202x], Information Technology – Information Management – Extensible Access Method (XAM) (stabilized maintenance of INCITS 464-2010 [R2015]) – comment due August 25
  • INCITS/ISO 5654-1:1984 [S202x], Information processing – Data interchange on 200 mm (8 in) flexible disk cartridges using twofrequency recording at 13 262 ftprad, 1,9 tpmm (48 tpi), on one side – Part 1: Dimensional, physical and magnetic characteristics (stabilized maintenance of INCITS/ISO 5654-1:1984 [R2015]) – comment due August 25
  • INCITS/ISO 6596-1:1985 [S202x], Information processing – Data interchange on 130 mm (5.25 in) flexible disk cartridges using twofrequency recording at 7 958 ftprad, 1.9 tpmm (48 tpi), on one side – Part 1: Dimensional, physical, and magnetic characteristics (stabilized maintenance of INCITS/ISO 6596-1:1985 [R2015]) – comment due August 25
  • INCITS/ISO 8630-1:1987 [S202x], Info processing-Data interchange on 130 mm (5.25 in) flexible disk cartridges using modified frequency modulation recording at 13 262 ftprad, on 80 tracks on each side – Part 1: Dimensional, physical, and magnetic characteristics (stabilized maintenance of INCITS/ISO 8630-1:1987 [R2015]) – comment due August 25
  • INCITS/ISO 3562:1976 [S202x], Information processing – Interchangeable magnetic single-disk cartridge (top loaded) – Physical and magnetic characteristics (stabilized maintenance of INCITS/ISO 3562:1976 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 7065-1:1985 [S202x], Info processing – Data interchange on 200 mm (8 in) flexible disk cartridges using modified frequency modulation recording,13 262 ftprad, 1,9 tpmm (48 tpi), both sides – Part 1: Dimensional, physical and magnetic characteristics (stabilized maintenance of INCITS/ISO/IEC 7065-1:1985 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 7487-1:1993 [S202x], Information technology – Data interchange on 130 mm (5,25 in) flexible disk cartridges using modified frequency modulation recording at 7 958 ftprad, 1,9 tpmm (48 tpi), on both sides – ISO type 202 – Part 1: Dimensional, physical and magnetic characteristics (stabilized maintenance of INCITS/ISO/IEC 7487-1:1993 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 8860-1:1987 [S202x], Information Processing – Data Interchange on 90 mm (3.5 In) Flexible Disk Cartridges Using Modified Frequency Modulation Recording at 7 958 ftprad on 80 Tracks on Each Side – Part 1: Dimensional, Physical and Magnetic Characteristics (stabilized maintenance of INCITS/ISO/IEC 8860-1:1987 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 9529-1:1989 [S202x], Information Processing Systems – Data Interchange on 90 mm (3,5 In) Flexible Disk Cartridges Using Modified Frequency Modulation Recording at 15 916 ftprad, on 80 Tracks on Each Side – Part 1: Dimensional, Physical and Magnetic Characteristics (stabilized maintenance of INCITS/ISO/IEC 9529-1:1989 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 19757-4:2006/COR 1:2008 [S202x], Information Technology – Document Schema Definition Languages (DSDL) – Part 4: Namespace-based Validation Dispatching Language (NVDL) – Technical Corrigendum 1 (stabilized maintenance of INCITS/ISO/IEC 19757-4:2006/COR 1:2008 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 19796-3:2009 [S202x], Information Technology – Learning, Education and Training – Quality Management, Assurance and Metrics – Part 3: Reference Methods and Metrics (stabilized maintenance of INCITS/ISO/IEC 19796-3:2009 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 3561:1976 [S202x], Information processing – Interchangeable magnetic six-disk pack – Track format (stabilized maintenance of INCITS/ISO/IEC 3561:1976 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 3563:1976 [S202x], Information processing – Interchangeable magnetic single-disk cartridge (top loaded) – Track format (stabilized maintenance of INCITS/ISO/IEC 3563:1976 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 3564:1976 [S202x], Information processing – Interchangeable magnetic eleven-disk pack – Physical and magnetic characteristics (stabilized maintenance of INCITS/ISO/IEC 3564:1976 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 3692:1996 [S202x], Information processing – Reels and cores for 25,4 mm (1 in) perforated paper tape for information interchange – Dimensions (stabilized maintenance of INCITS/ISO/IEC 3692:1996 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 4337:1977 [S202x], Information processing – Interchangeable magnetic twelve-disk pack (100 Mbytes) (stabilized maintenance of INCITS/ISO/IEC 4337:1977 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 5653:1980 [S202x], Information processing – Interchangeable magnetic twelve-disk pack (200 Mbytes) (stabilized maintenance of INCITS/ISO/IEC 5653:1980 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 10744:1997 [S202x], Information Technology – Hypermedia/Time-Based Structuring Language (HyTime) (stabilized maintenance of INCITS/ISO/IEC 10744:1997 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 10885:1993 [S202x], Information technology – 356 mm optical disk cartridge for information interchange – Write once (stabilized maintenance of INCITS/ISO/IEC 10885:1993 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 11560:1992 [S202x], Information Technology – Information Interchange on 130 mm Optical Disk Cartridges Using the Magneto-Optical Effect, for Write Once, Read Multiple Functionality (stabilized maintenance of INCITS/ISO/IEC 11560:1992 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 14760:1997 [S202x], Information technology – Data interchange on 90 mm overwritable and read only optical disk cartridges using phase change – Capacity: 1,3 Gbytes per cartridge (stabilized maintenance of INCITS/ISO/IEC 14760:1997 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 15445:2000 [S202x], Information technology – Document description and processing languages – HyperText Markup Language (HTML) (stabilized maintenance of INCITS/ISO/IEC 15445:2000 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 15485:1997 [S202x], Information technology – Data interchange on 120 mm optical disk cartridges using phase change PD format – Capacity: 650 Mbytes per cartridge (stabilized maintenance of INCITS/ISO/IEC 15485:1997 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 15498:1997 [S202x], Information technology – Data interchange on 90 mm optical disk cartridges – HS-1 format – Capacity: 650 Mbytes per cartridge (stabilized maintenance of INCITS/ISO/IEC 15498:1997 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 15718:1998 [S202x], Information technology – Data interchamge on 8 mm wide magnetic tape cartridge – Helical scan recording – HH-1 format (stabilized maintenance of INCITS/ISO/IEC 15718:1998 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 15895:1999 [S202x], Information technology – Data interchange on 12,7 mm 128-track magnetic tape cartridges – DLT 3-XT format (stabilized maintenance of INCITS/ISO/IEC 15895:1999 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 15896:1999 [S202x], Information technology – Data interchange on 12,7 mm 208-track magnetic tape cartridges – DLT 5 format (stabilized maintenance of INCITS/ISO/IEC 15896:1999 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 16382:2000 [S202x], Information technology – Data interchange on 12,7 mm 208-track magnetic tape cartridges – DLT 6 format (stabilized maintenance of INCITS/ISO/IEC 16382:2000 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 16824:1999 [S202x], Information technology – 120 mm DVD rewritable disk (DVD-RAM) (stabilized maintenance of INCITS/ISO/IEC 16824:1999 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 16825:1999 [S202x], Information technology – Case for 120 mm DVD-RAM disks (stabilized maintenance of INCITS/ISO/IEC 16825:1999 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 16969:1999 [S202x], Information technology – Data interchange on 120 mm optical disk cartridges using +RW format – Capacity: 3,0 Gbytes and 6,0 Gbytes (stabilized maintenance of INCITS/ISO/IEC 16969:1999 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 17342:2004 [S202x], Information Technology – 80 Mm (1,46 Gbytes Per Side) and 120 mm (4,70 Gbytes per Side) DVD Re-Recordable Disk (DVD-RW) (stabilized maintenance of INCITS/ISO/IEC 17342:2004 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 17346:2005 [S202x], Information Technology – Data Interchange on 90 mm Optical Disk Cartridges – Capacity: 1,3 Gbytes per Cartridge (stabilized maintenance of INCITS/ISO/IEC 17346:2005 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 17592:2004 [S202x], Information technology – 120 mm (4,7 Gbytes per side) and 80 mm (1,46 Gbytes per side) DVD rewritable disk (DVD-RAM) (stabilized maintenance of INCITS/ISO/IEC 17592:2004 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 17594:2004 [S202x], Information technology – Cases for 120 mm and 80 mm DVD-RAM disks (stabilized maintenance of INCITS/ISO/IEC 17594:2004 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 17913:2000 [S202x], Information Technology – 12,7mm 128-Track Magnetic Tape Cartridge for Information Interchange – Parallel Serpentine Format (stabilized maintenance of INCITS/ISO/IEC 17913:2000 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 22533:2005 [S202x], Information Technology – Data Interchange on 90 mm Optical Disk Cartridges – Capacity: 2,3 Gbytes per Cartridge (stabilized maintenance of INCITS/ISO/IEC 22533:2005 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 23912:2005 [S202x], Information Technology – 80 mm (1,46 Gbytes per Side) and 120 mm (4,70 Gbytes per Side) DVD Recordable Disk (DVD-R) (stabilized maintenance of INCITS/ISO/IEC 23912:2005 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 25435:2006 [S202x], Data Interchange on 60 mm Read-Only ODC – Capacity: 1,8 Gbytes (UMDTM) (stabilized maintenance of INCITS/ISO/IEC 25435:2006 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 29171:2009 [S202x], Information technology – Digitally recorded media for information interchange and storage – Information versatile disk for removable usage (iVDR) cartridge (stabilized maintenance of INCITS/ISO/IEC 29171:2009 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 8879:1986/AM 1:1988 [S202x], Information Processing – Text and Office Systems – Standard Generalized Markup Language (SGML) – Amendment 1 (stabilized maintenance of INCITS/ISO/IEC 8879:1986/AM 1:1988 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 8879:1986/COR 1:1996 [S202x], Information Processing – Text and Office Systems – Standard Generalized Markup Language (SGML) – Technical Corrigendum 1 (stabilized maintenance of INCITS/ISO/IEC 8879:1986/COR 1:1996 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 8879:1986/COR 2:1999 [S202x], Information Processing – Text and Office Systems – Standard Generalized Markup Language (SGML) – Technical Corrigendum 2 (stabilized maintenance of INCITS/ISO/IEC 8879:1986/COR 2:1999 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 10036:1996/COR 1:2001 [S202x], Information Technology – Font Information Interchange – Procedures for Registration of Font-Related Identifiers – Technical Corrigendum 1 (stabilized maintenance of INCITS/ISO/IEC 10036:1996/COR 1:2001 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 10036:1996/COR 2:2002 [S202x], Information Technology – Font Information Interchange – Procedures for Registration of Font-Related Identifiers – Technical Corrigendum 2 (stabilized maintenance of INCITS/ISO/IEC 10036:1996/COR 2:2002 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 10179:1996/COR 1:2001 [S202x], Information Technology – Processing Languages – Document Style Semantics and Specification Language (DSSSL) – Technical Corrigendum 1 (stabilized maintenance of INCITS/ISO/IEC 10179:1996/COR 1:2001 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 10179:1996/AM 2:2005 [S202x], Information Technology – Processing Languages – Document Style Semantics and Specification Language (DSSSL) – Amendment 2 (stabilized maintenance of INCITS/ISO/IEC 10179:1996/AM 2:2005 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 10180:1995/COR 1:2001 [S202x], Information Technology – Processing Languages – Standard Page Description Language (SPDL) – Technical Corrigendum 1 (stabilized maintenance of INCITS/ISO/IEC 10180:1995/COR 1:2001 [R2015]) – comment due August 25
  • INCITS/ISO 8378-3-1986 [S2018], Information Processing – Data Interchange on 130 mm (5.25 in) Flexible Disk Cartridges Using Modified Frequency Modulation Recording at 7 958 ftprad, 3,8 tpmm (96 tpi), on Both Sides – Part 3: Track Format B (withdrawal of INCITS/ISO 8378-3-1986 [S2018]) – comment due August 25
  • INCITS/ISO 19111-2:2009 [2015], Geographic information – Spatial referencing by coordinates – Part 2: Extension for parametric values (withdrawal of INCITS/ISO 19111-2:2009 [2015]) – comment due August 25
  • INCITS/ISO/IEC 8378-1:1986 [R2015], Information Processing – Data Interchange on 130 mm (5.25 in) Flexible Disk Cartridges Using Modified Frequency Modulation Recording at 7 958 ftprad, 3,8 tpmm (96 Tpi), on Both Sides – Part 1: Dimensional, Physical and Magnetic Characteristics (withdrawal of INCITS/ISO/IEC 8378-1:1986 [R2015]) – comment due August 25
  • INCITS/ISO/IEC 27004:2009 [2015], Information technology – Security techniques – Information security management – Measurement (withdrawal of INCITS/ISO/IEC 27004:2009 [2015]) – comment due August 25

ITSDF

  • BSR/ITSDF B56.11.7-202X, Liquefied Petroleum Gas (LPG) Fuel Cylinders (Horizontal or Vertical) Mounting – Liquid Withdrawal – for Powered Industrial Trucks (revision of ANSI/ITSDF B56.11.7-2011) – comment due July 6

NECA

  • BSR/NECA 411-202X, Installing and Maintaining Uninterruptible Power Supplies (revision of ANSI/NECA 411-2014) – comment June 29
  • BSR/NECA 702-202X, Recommended Practice for Maintaining Power Quality of Electrical Power Distribution Systems (new standard) – comment due July 6
  • BSR/NECA/IESNA 500-202X, Standard for Installing and Maintaining Indoor Commericial Lighting Systems (new standard) – comment due August 3
  • BSR/NECA 412-202X, Standard for Installing and Maintaining Photovoltaic (PV) Powers Systems (revision of ANSI/NECA 412-2012) – comment due August 3

NEMA

  • BSR C136.52-202x, Standard for Roadway and Area Lighting Equipment – LED Drivers with Integral Revenue Grade Energy Measurement Means (new standard) – comment due July 13
  • BSR C37.54-2003 (R202x), Standard for Alternating Current High-Voltage Circuit Breakers Applied in Metal-Enclosed Switchgear – Conformance Test Procedures (reaffirmation of ANSI C37.54-2003 (R2010)) – comment due July 13
  • BSR C78.374-2015 (R202x), Electric Lamps – Light Emitting Diode Specification Sheet for General Illumination Applications (reaffirmation of ANSI C78.374-2015) – comment due July 13
  • BSR C78.376-2014 (R202x), Electric Lamps – Specifications for the Chromaticity of Fluorescent Lamps (reaffirmation of ANSI C78.376-2014) – comment due July 13
  • BSR C78.LL3-2003 (S202x), Electric Lamps – Procedures for High Intensity Discharge Lamp Sample Preparation and the Toxicity Characteristic Leaching Procedure (stabilized maintenance of ANSI C78.LL3-2003 (R2015)) – comment due July 13
  • BSR C78.379-2006 (S202x), Electric Lamps – Classification of the Beam Patterns of Reflector Lamps (stabilized maintenance of ANSI C78.379-2006 (R2015)) – comment due July 13
  • BSR C78.390-2006 (S202x), Electric Lamps – Method of Designation for Electric Lamps – Miniature and Sealed-Beam Incandescent Lamps (stabilized maintenance of ANSI C78.390-2006 (R2015)) – comment due July 13
  • BSR C78.LL1256-2003 (S202x), Electric Lamps – Procedures for Fluorescent Lamp – Sample Preparation and the Toxicity Characteristic Leaching Procedure (stabilized maintenance of ANSI C78.LL1256-2003 (R2015)) – comment due July 13
  • BSR C78.1406-2004 (S202x), Electric Lamps Electric Lamps – P28 Single-Contact Medium Prefocus Based Projection Lamps for BaseDown Operation – Dimensions (stabilized maintenance of ANSI C78.1406-2004 (R2015) – comment due July 13
  • BSR C78.1407-2004 (S202x), Electric Lamps – Condenser-Reflector, Four-Pin Prefocus-Base Projection Lamps – Dimensions (stabilized maintenance of ANSI C78.1407-2004 (R2015)) – comment due July 13
  • BSR C78.1408-2004 (S202x), Electric Lamps – CBA Projection Lamp (stabilized maintenance of ANSI C78.1408-2004 (R2015)) – comment due July 13
  • BSR C78.1452-2004 (S202x), Electric Lamps – Projection Lamps – Vocabulary (stabilized maintenance of ANSI C78.1452-2004 (R2015)) – comment due July 13
  • BSR C78.1460-2004 (S202x), Electric Lamps – Single-Ended Tungsten-Halogen Lamps – GZ9.5 Base, T6 Bulb, 36.5mm LCL, 76.2mm MOL with Proximity Reflector (stabilized maintenance of ANSI C78.1460-2004 (R2015)) – comment due July 13
  • BSR C82.15-202X, LED Drivers Robustness (new standard) – comment due July 13
  • BSR/NEMA WC 61-1992 (R202x), Transfer Impedance Testing (reaffirmation of ANSI/NEMA WC 61-1992 (R2015)) – comment due July 27
  • BSR C137.7-202X, Standard for Lighting Systems – Networked Parking Lot Lighting Systems (new standard) – comment due August 3
  • BSR C37.57-202x, Standard for Switchgear – Metal-Enclosed Interrupter Switchgear Assemblies – Conformance Testing (revision of ANSI C37.57-2003 (R2010)) – comment due August 10

NETA

  • BSR/NETA ATS-2021-202x, NETA Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems (revision of ANSI/NETA ATS-2017) – comment due August 10

NSF

  • BSR/NSF 14-202x (i107r3), Plastics Piping System Components and Related Materials (revision of ANSI/NSF 14-2019) – comment due July 12
  • BSR/NSF/CAN 60-202x (i92r1), Drinking Water Treatment Chemicals – Health Effects (revision of ANSI/NSF/CAN 60-2019) – comment due July 12
  • BSR/NSF 49-202x (i130Ar1), Biosafety Cabinetry: Design, Construction, Performance, and Field Certification (revision of ANSI/NSF 49-2019) – comment due July 13
  • BSR/NSF/CAN 60-202x (i88r1), Drinking Water Treatment Chemicals – Health Effects (revision of ANSI/NSF/CAN 60-2019) – comment due July 19
  • BSR/NSF 42-202x (i104r1), Drinking Water Treatment Units – Aesthetic Effects (revision of ANSI/NSF 42-2019) – comment due July 26
  • BSR/NSF 53-202x (i122r1), Drinking Water Treatment Units – Health Effects (revision of ANSI/NSF 53-2019) – comment due July 26
  • BSR/NSF 244-202x (i8r1), Supplemental Microbiological Water Treatment Systems – Filtration (revision of ANSI/NSF 244-2019) – comment due July 26
  • BSR/NSF 350-202x (i49r1), Onsite Residential and Commercial Water Reuse Treatment Systems (revision of ANSI/NSF 350-2019) – comment due July 26
  • BSR/NSF 350-202x (i55r1), Onsite Residential and Commercial Water Reuse Treatment Systems (revision of ANSI/NSF 350-2019) – comment due July 26
  • BSR/NSF 401-202x (i16), Drinking Water Treatment Units – Emerging Compounds / Incidental Contaminants (revision of ANSI/NSF 401-2019) – comment due July 26
  • BSR/NSF 14-202x (i108r1), Plastics Piping System Components and Related Materials (revision of ANSI/NSF 14-2019) – comment due July 27
  • BSR/NSF 53-202x (i121r1), Drinking Water Treatment Units – Health Effects (revision of ANSI/NSF 53-2019) – comment due August 2
  • BSR/NSF 53-202x (i125r1), Drinking Water Treatment Units – Health Effects (revision of ANSI/NSF 53-2019) – comment due August 17
  • BSR/NSF 58-202x (i90r1), Reverse Osmosis Drinking Water Treatment Systems (revision of ANSI/NSF 58-2019) – comment due August 17

OPEI

  • BSR/ILTVA Z135-2012 (R202x), (Standard) for Personal Transport Vehicles – Safety and Performance Specifications (reaffirmation of ANSI/ILTVA Z135-2012)) – comment due July 6

PMI

  • BSR/PMI 19-001-202X, The Standard for Project Management (revision of ANSI/PMI 99-001-2017) – comment due July 27

RIA

  • BSR/RIA R15.08-1-202x, Industrial Mobile Robots – Safety Requirements – Part 1: Requirements for the Industrial Mobile Robot (new standard) – comment due August 10

SCTE

  • BSR/SCTE 170-202x, Preparing an MDU Amplifier Extender Specification (revision of ANSI/SCTE 170-2010) – comment due July 6
  • BSR/SCTE 110-202x, Hybrid Fiber Coax Outside Plant Status Monitoring: Alternative Power Supply to Transponder Interface Bus (PSTIB) for HMS Transponders (revision of ANSI/SCTE 110-2011) – comment due August 3

SDI

  • BSR/SDI SD-202x, Standard for Steel Deck (revision, redesignation and consolidation of ANSI/SDI-C-2017, ANSI/SDI NC-2017, and ANSI/SDI RD-2017) – comment due July 6
  • BSR/SDI T-CD-202x, Test Standard for Composite Steel Deck Slabs (revision of ANSI/SDI T-CD-2017) – comment due July 6
  • BSR A250.6-202x, Recommended Practice for Hardware Reinforcing on Standard Steel Doors and Frames (revision of ANSI A250.6-2015) – comment due August 17

TIA

  • BSR/TIA 455-244-A-202x, Methods for Measuring the Change in Transmittance of Optical Fibers in Expressed Buffer Tubes When Subjected to Temperature Cycling Revision (revision and redesignation of ANSI/TIA 455-244-2011) – comment due July 6
  • BSR/TIA 4950-B-202x, Requirements for battery-Powered, Portable Land Mobile Radio Applications in Class I, II, III, Division I, Hazardous (Classified) Locations (revision and redesignation of ANSI/TIA 4950-A-2014) – comment due July 20
  • BSR/TIA 568.2-D-2-202x, Balanced Twisted-Pair Telecommunications Cabling and Components Standard – Addendum 2: Power Delivery Over Balanced Twisted-Pair Cabling (addenda to ANSI/TIA 568.2-D-2018) – comment due July 26

TCNA

  • BSR A108.20-202x, Standard Specifications for Exterior Installation of Vertical and Overhead Gauged Porcleain Tiles and Gauged Porcelain Tile Panels/Slabs by the Thin-Bed Method Bonded with Improved Modified Dry-Set Cement Mortar (new standard) – comment due July 20
  • BSR A136.1-202x, Standard Specifications for Organic Adhesives for Installation of Ceramic Tile (revision of ANSI A136.1-2008 (R2013)) – comment due July 20
  • BSR A326.3-202x, Standard Test Method for Measuring Dynamic Coefficient of Friction of Hard Surface Flooring Materials (revision of ANSI A326.3-2017) – comment due July 20

UL

  • BSR/UL 508A-202x, Standard for Safety for Industrial Control Panels (revision of ANSI/UL 508A-2020) – comment due July 5
  • BSR/UL 4248-19-202x, Standard for Safety for Fuseholders – Part 19: Photovoltaic Fuseholders (revision of ANSI/UL 4248-19-2015) – comment due July 5
  • BSR/UL 823-202X, Standard for Safety for Electric Heaters for Use in Hazardous (Classified) Locations (revision of ANSI/UL 823-2007 (R2016)) – comment due July 6
  • BSR/UL 1996-202X, Standard for Electric Duct Heaters (revision of ANSI/UL 1996-2016) – comment due July 6
  • BSR/UL 2557-202X, Standard for Membrane Switches (new standard) – comment due July 7
  • BSR/UL 498-202x, Standard for Safety for Attachment Plugs and Receptacles (revision of ANSI/UL 498-2020) – comment due July 12
  • BSR/UL 514C-202X, Standard for Safety for Nonmetallic Outlet Boxes, Flush-Device Boxes, and Covers (revision of ANSI/UL 514C-2020) – comment due July 12
  • BSR/UL 521-202x, Standard for Safety for Heat Detectors for Fire Protective Signaling Systems (revision of ANSI/UL 521-2019) – comment due July 12
  • BSR/UL 753-202x, Standard for Safety for Alarm Accessories for Automatic Water-Supply Control Valves for Fire-Protection Service (revision of ANSI/UL 753-2013 (R2018)) – comment due July 12
  • BSR/UL 1247-202x, Standard for Safety for Diesel Engines for Driving Stationary Fire Pumps (revision of ANSI/UL 1247-2020) – comment due July 12
  • BSR/UL 1369-202x, Standard for Safety for Aboveground Piping for Flammable and Combustible Liquids (revision of ANSI/UL 1369-2018a) – comment due July 12
  • BSR/UL 121201-202x, Standard for Safety for Nonincendive Electrical Equipment for Use in Class I and II, Division 2 and Class III, Divisions 1 and 2 Hazardous (Classified) Locations (revision of ANSI/UL 121201-2019) – comment due July 12
  • BSR/UL 60079-31-2015 (R202x), Standard for Safety for Explosive Atmospheres – Part 31: Equipment Dust Ignition Protection by Enclosure “t” (reaffirm a national adoption ANSI/UL 60079-31-2015) – comment due July 13
  • BSR/UL 268A-202x, Standard for Safety for Smoke Detectors for Duct Application (revision of ANSI/UL 268A-2016) – comment due July 13
  • BSR/UL 347-202x, Standard for Safety for Medium-Voltage AC Contactors, Controllers, and Control Centers (revision of ANSI/UL 347-2016) – comment due July 13
  • BSR/UL 101-202x, Standard for Safety for Leakage Current for Utilization Equipment (revision of ANSI/UL 101-2019) – comment due July 19
  • BSR/UL 263-202x, Standard for Safety for Fire Tests of Building Construction and Materials (revision of ANSI/UL 263-2018) – comment due July 19
  • BSR/UL 1278-202x, Standard for Safety for Movable and Wall- or Ceiling-Hung Electric Room Heaters (revision of ANSI/UL 1278-2018) – comment due July 19
  • BSR/UL 8750-202x, Standard for Safety for Light Emitting Diode (LED) Equipment for Use in Lighting Products (revision of ANSI/UL 8750-2020) – comment due July 19
  • BSR/UL 1479-202x, Standard for Safety for Fire Tests of Penetration Firestops (revision of ANSI/UL 1479-2015) – comment due July 19
  • BSR/UL 60079-5-2016 (R202x), Standard for Safety for Explosive Atmospheres – Part 5: Equipment Protection by Powder Filling “q” (reaffirm a national adoption ANSI/UL 60079-5-2016) – comment due July 20
  • BSR/UL 60079-6-2016 (R202x), Standard for Safety for Explosive Atmospheres – Part 6: Equipment Protection by Liquid Immersion “o” (reaffirm a national adoption ANSI/UL 60079-6-2016) – comment due July 20
  • BSR/UL 347A-202x, Standard for Safety for Medium Voltage Power Conversion Equipment (revision of ANSI/UL 347A-2019) – comment due July 20
  • BSR/UL 982-202x, Standard for Safety for Motor-Operated Household Food Preparing Machines (revision of ANSI/UL 982-2017) – comment due July 20
  • BSR/UL 121303-202x, Standard for Safety for Guide for Use of Detectors for Flammable Gases (revision and redesignation of ANSI/UL 121303-202x) – comment due July 20
  • BSR/UL 13-202x, Standard for Safety for Power-Limited Circuit Cables (revision of ANSI/UL 13-2019) – comment due July 26
  • BSR/UL 360-202X, Standard for Liquid-Tight Flexible Metal Conduit (revision of ANSI/UL 360-2019) – comment due July 26
  • BSR/UL 412-202X, Standard for Safety for Refrigeration Unit Coolers (revision of ANSI/UL 412-2011) – comment due July 26
  • BSR/UL 923-202x, Standard for Safety for Microwave Cooking Appliances (revision of ANSI/UL 923-2019) – comment due July 26
  • BSR/UL 962A-202x, Standard for Safety for Furniture Power Distribution Units (revision of ANSI/UL 962A-2020) – comment due July 26
  • BSR/UL 1203-202x, Standard for Safety for Explosion-Proof and Dust-Ignition-Proof Electrical Equipment for Use in Hazardous (Classified) Locations (revision of ANSI/UL 1203-2020) – comment due July 26
  • BSR/UL 1564-202x, Standard for Safety for Industrial Battery Chargers (revision of ANSI/UL 1564-2013 (R2017)) – comment due July 26
  • BSR/UL 2225-202x, Standard for Safety for Cables and Cable-Fittings for Use in Hazardous (Classified) Locations (revision of ANSI/UL 2225-2020) – comment due July 26
  • BSR/UL 2250-202X, Standard for Safety for Instrumentation Tray Cable (revision of ANSI/UL 2250-2017) – comment due July 26
  • BSR/UL 61810-1-202x, Standard for Electromechanical Elementary Relays – Part 1: General Requirements (revision of ANSI/UL 61810-1-2015) – comment due July 26
  • BSR/UL 5A-2015 (R202x), Standard for Nonmetallic Surface Raceways and Fittings (reaffirmation of ANSI/UL 5A-2015) – comment due July 27
  • BSR/UL 5-2016 (R202x), Standard for Surface Metal Raceways and Fittings (reaffirmation of ANSI/UL 5-2016) – comment due July 27
  • BSR/UL 5C-2016 (R202x), Standard for Surface Raceways and Fittings for Use with Data, Signal, and Control Circuits (reaffirmation of ANSI/UL 5C-2016) – comment due July 27
  • BSR/UL 209-2016 (R202x), Standard for Cellular Metal Floor Raceways and Fittings (reaffirmation of ANSI/UL 209-2016) – comment due July 27
  • BSR/UL 248-8-2011 (R202x), Standard for Safety for Low-Voltage Fuses – Part 8: Class J Fuses (reaffirmation of ANSI/UL 248-8-2011 (R2015)) – comment due July 27
  • BSR/UL 248-10-2011 (R202x), Standard for Safety for Low-Voltage Fuses – Part 10: Class L Fuses (reaffirmation of ANSI/UL 248-10-2011 (R2015)) – comment due July 27
  • BSR/UL 248-11-2011 (R202x), Standard for Safety for Low-Voltage Fuses – Part 11: Plug Fuses (reaffirmation of ANSI/UL 248-11-2011 (R2015)) – comment due July 27
  • BSR/UL 2040-2015 (R202x), Standard for Safety for Folding Rollaway Tables (reaffirmation of ANSI/UL 2040-2015) – comment due July 27
  • BSR/UL 1838-202x, Standard for Safety for Low Voltage Landscape Lighting Systems (revision of ANSI/UL 1838-2017) – comment due July 27
  • BSR/UL 2416-202x, Standard for Safety for Audio/Video, Information and Communication Technology Equipment cabinet, Enclosure and Rack Systems (revision of ANSI/UL 2416-2019) – comment due July 27
  • BSR/UL 1076-202X, Standard for Safety for Proprietary Burglar Alarm Units and Systems (revision of ANSI/UL 1076-2018) – comment due August 2
  • BSR/UL 1563-202x, Standard for Safety for Electric Spas, Equipment Assemblies, and Associated Equipment (revision of ANSI/UL 1563-2017) – comment due August 2
  • BSR/UL 150-2011 (R202x), UL Standard for Safety for Antenna Rotators (reaffirmation of ANSI/UL 150-2011 (R2015)) – comment due August 10
  • BSR/UL 2024-2015 (R202x), Standard for Cable Routing Assemblies and Communications Raceways (reaffirmation of ANSI/UL 2024 -2015) – comment due August 10
  • BSR/UL 1191-202X, Standard for Components for Personal Flotation Devices (revision of ANSI/UL 1191-2019) – comment due August 10
  • BSR/UL 884-2016 (R202x), Standard for Underfloor Raceways and Fittings (reaffirmation of ANSI/UL 884-2016) – comment due August 11
  • BSR/UL 248-13-2005 (R202x), Standard for Safety for Low-Voltage Fuses – Part 13: Semiconductor Fuses (reaffirmation of ANSI/UL 248-13-2005 (R2015)) – comment due August 17
  • BSR/UL 1180-202X, Standard for Fully Inflatable Recreational Personal Flotation Devices (revision of ANSI/UL 1180-2017) – comment due August 17
  • BSR/UL 144-202x, Standard for Safety for LP-Gas Regulators (revision of ANSI/UL 144-2019) – comment due August 18
  • BSR/UL 567-202x, Standard for Emergency Breakaway Fittings, Swivel Connectors, and Pipe-Connection Fittings for Petroleum Products and LP-Gas (revision of ANSI/UL 567-2017) – comment due August 18
  • BSR/UL 12402-9-202X, Standard for Personal Flotation Devices – Part 9: Test Methods (national adoption of ISO 12402-9:2006 with modifications and revision of ANSI/UL 12402-9-2015) – comment due August 25
  • BSR/UL 330-202x, Standard for Hose and Hose Assemblies for Dispensing Flammable Liquids (revision of ANSI/UL 330-2019) – comment due August 25
  • BSR/UL 2900-2-1-202X, Standard for Software Cybersecurity for Network-Connectable Products – Part 2-1: Particular Requirements for Network Connectable Components of Healthcare and Wellness Systems (revision of ANSI/UL 2900-2-1-2020) – comment due August 25

2 Responses

Add a Comment

You must be logged in to post a comment